Loading...
MA 02/03-LR03031148) 49) 5O) CLIENT: PROJECT: Hooper Engineering Laboratories, Inc. Construction Msterisls Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11,0% Moisture LOCATION PROCTOR LIFT Paving ~ 223 Woodhurst, Eastbound east DATE: 11 March 2003 JOB NO.: 02.1077 MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % middle west 1 Final 9.2 123.2 102.7 1 Final 10.2 121.4 101.2 1 Final 10.5 125.2 104.3 95+ TECHNICIAN: MFM DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane D. lla$, Text8 75229 (214) 351-6419 Fax (214) 351-5148