Loading...
MA 02/03-LR030306Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 6 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving patch, culdesacin front of 252 Heather Glen LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 213 Cement Ticket No. 89021844 Flyash Time Batched 1:24pm Sand Time Sampled 2:05pm in. Concrete Temp. (ASTM C1064) 57°F 1.0 in. Air Content (ASTM C231] 3,0% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 66 4.00 7 03/13/03 131,700 4660 69 4.00 7 03/13/03 126,400 4470 70 4.00 14 03/20/03 142,500 5040 71 4.00 14 03/20/03 2L41,800 5020 72 4.00 28 04/03/03 -152,50.0 5580 73 4.00 28 04/03/03 ~.5.7,.7Q0 5580 28-Day Average 5580 4000 TECHNICIAN: DISTRIBUTION: TMC (l:00pm-3:O0pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148