Loading...
MA 02/03-LR030304Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 4 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving patch, westbound Woodhurst from 20' west of southbound Willow Springs, 0'-12' south of north curb at Woodbury LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 110 Cement Ticket No. 89021689 Flyash Time Batched 9:34am Sand Time Sampled 10:1 lam in. Concrete Temp. IASTM C1064} 60°F 1.0 in. Air Content {ASTM C231) 4.7% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C391 340L1504 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 62 4.50 7 03/11/03 63 4.50 7 03/11/03 64 4.50 14 03/18~03 65 4.50 14 03/18/03 66 4.50 28 04/01/03 67 4.50 28 04/01/03 128,200 4530 130,300 4610 138,400 4900 142,800 5050 153,00Q 5410 147,400 5Z1Q 28-Day Average 5310 4OO0 TECHNICIAN: DISTRIBUTION: CBC (9:30am-11:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148