Loading...
MA 02/03-LR030219Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 19 February 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, eastbound Bethel School Rd., 20%50' west of southbound Plantation Rd. LOCATION OF POUR SET 2: SAMPLE DATA: SET I SET 2 MIX NO. Truck No. 124 Cement Ticket No. 89021589 Flyash Time Batched 11:22am Sand Time Sampled 12:15pm in. Concrete Temp. (ASTM C10641 64°F 1.0 in. Air Content IASTM C231 } 4.9 % Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) 340L1504 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 56 3.50 7 02/26/03 57 3.50 7 02/26/03 58 3.50 14 03/05/03 59 3.50 14 03/05/03 60 3.50 28 03/19/03 61 3.50 28 03/19/03 127,000 4490 122,500 4330 139,~00 4920 144,800 5120 15O,OOO 5520 154,100 5450 28-DayAverage 5380 4000 TECHNICIAN: DISTRIBUTION: CBC (11:30am-1:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148