MA 02/03-LR0302183O)
31)
32)
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp. DATE: 18 February 2003
PROJECT: City of Coppell Street Repair Project JOB NO.: 02.1077
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1 ) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture
MOISTURE DRY PERCENT REQUIRED
LOCATION PROCTOR LIFT CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Eastbound Bethel School C~ Plantation
east end 1 Final 8.0 123.5 102.9 95+
middle 1 Final 11.1 122.2 101.8
west end 1 Final 9.3 124.9 104.1
TECHNICIAN: MFM
DISTRIBUTION: (1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148