Loading...
MA 02/03-LR030213Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Pavement Services Corp. DATE: PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: LOCATION OF POUR SET 1: Paving, eastbound lane of Glen Lakes in front of 659 Glen Lakes LOCATION OF POUR SET 2: 02.1077 13 February 2003 Beall SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 120 Cement Ticket No. 89021327 Flyash Time Batched 7:39am Sand Time Sampled 8:55am in. Concrete Temp. (ASTM C10§4) 67°F 1.0 in. Air Content (ASTM C231) 4.1% Water Unit Weight IASTM C138) Admix # 1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM Cl 43) psi Strength 50 4.75 7 02~20/03 51 4.75 7 02/20/03 52 4.75 14 02/27~03 53 4.75 14 02/27/03 54 4.75 28 03/13/03 55 4.75 28 03/13/03 113,000 4000 112,800 3990 133,300 4720 132,800 4700 142,200 5030 144,300 5100 28-Day Average 5070 4000 TECHNICIAN: DISTRIBUTION: EWM (7:30am-10:00am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214),351-6419 Fax (214) 351-5148