Loading...
MA 02/03-LR030211Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Pavement Services Corp. DATE: PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: LOCATION OF POUR SET 1: Paving, northbound lane at 124 Lansdowne. LOCATION OF POUR SET 2: 02,1077 11 February 2003 CowTown Redi-Mix SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 908 Cement Ticket No. 9821 Flyash Time Batched 10:07am Sand Time Sampled 11:20am in. Concrete Temp. {ASTM C1064) 58°F 1.0 in. Air Content {ASTM C231} 4.4% Water Unit Weight {ASTM c13al Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM Cl 43) psi Strength 44 5.00 7 02/18/03 45 5.00 7 02/18/03 48 5.00 14 02/25/03 47 5.00 14 02/25/03 48 5.00 28 03/11/03 49 5.00 28 03/11/03 109,500 3870 108,400 3830 116,700 4130 119,400 4220 132,500 4690 134~100 4740 28-Day Average 4720 4000 TECHNICIAN: DISTRIBUTION: MFM (10:15am-12:15pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148