Loading...
MA 02/03-LR030205Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 5 February 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, middle of Bethel School Road, from 160'-190' west of Denton Tap and 10'-20' south of north curbline LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 125 Cement Ticket No. 89021095 Flyash Time Batched 11:24am Sand Time Sampled 12:10pm in. Concrete Temp. (ASTM C1064) 60°F 1.0 in. Air Content (ASTM C231) 4.8% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C143) psi Strength 38 3.50 7 02/12/03 39 3.50 7 02/12/03 40 3.50 14 02/19/03 41 3.50 14 02/19/03 42 3.50 28 03/05/03 43 3.50 28 03/05/03 116,100 4010 119,100 4210 126,00Q 446Q 133,800 4730 147,100 5200 148,600 5260 28~Day Average 5230 4000 TECHNICIAN: DISTRIBUTION: CBC (11:30am-1:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148