Loading...
MA 02/03-LR030203Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 3 February 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving patch on northbound Heartz inbetween 115 and 117 Heartz St. LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 219 Cement Ticket No. 13609844 Flyash Time Batched 10:13am Sand Time Sampled 11:20am in. Concrete Temp. (ASTM C1064) 68°F 1.0 in. Air Content (ASTM C231) 4.3% Water Unit Weight (ASTM C135) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 32 5.25 7 02/10/03 117,300 4150 33 5.25 7 02/10/03 119,300 4220 34 5.25 14 02/17/03 133,700 4730 35 5.25 14 02/17/03 156,?00 4840 36 5.25 28 03/03/03 148,500 5250 37 5.25 28 03/03/03 145,200 5140 28-Day Average 5200 4000 TECHNICIAN: DISTRIBUTION: CBC (11:00am-1:OOpm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148