Loading...
MA 02/03-LR030131Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 31 January 2003 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX JOB NO.: 02.1077 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Paving Replacement (~ Willow Sprinqs and Woodhurst 16) north end 1 CTB 9.1 17) middle 1 CTB 10.0 18) south end 1 CTB 11.0 135.8 113.2 137.8 114.8 126.2 105.2 Paving Replacement ~ 115 Heartz Road 19) northeast corner 1 CTB 11.0 132.1 110.1 20) middle 1 CTB 10.4 136.2 113.5 21) southwest corner 1 CTB 12.2 132.0 110.0 95+ TECHNICIAN: DISTRIBUTION: CDJ (2 trips) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148