Loading...
MA 02/03-LR030128Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 28 January 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, eastbound Bane Bethel School Rd., 0'-10' north of south curb and approx. 0'-40' west of approach to Ace Hardware Store (NW entrance) LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 125 Cement Ticket No. 123250 Fiyash Time Batched 2:36pm Sand Time Sampled 3:10pm in. Concrete Temp. (ASTM C1064) 59°F 1.0 in. Air Content (ASTM C231) 4.1% Water Unit Weight (ASTM C138} Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day IASTM C143) psi Strength 26 4.25 7 02/04/03 27 4.25 7 02/04/03 28 4.25 14 02/11/03 29 4.25 14 02/11/03 30 4.25 28 02/25/03 31 4.25 28 02/25/03 119,100 4210 115,800 4100 130,200 4600 129,800 4590 150,300 5320 147,800 5230 28-Day Average 5280 4O0O TECHNICIAN: DISTRIBUTION: GB (l:30pm-4:OOpm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 381-5148