Loading...
MA 02/03-LR030604Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 4 June 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Alley paving, east alley for Pinyon approach off Barclay, from 60'-40' south of Barclay LQCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck NO. 124 Cement Ticket No. 89026779 Flyash Time Batched 10:36am Sand Time Samp[ed 11:25am in. Concrete Temp. (ASTM C1064) 91 °F 1.0 in. Air Content (ASTM C231) 4.8% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS (ASTM C30} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 2B-Day (ASTM C143) psi Strength 230 3.75 7 06/11/03 115,500 4090 23I 3.75 7 06/11/03 108,100 3820 232 3.75 14 06/18/03 127,300 4500 233 3.75 14 06/18/03 127,800 4520 234 3.75 28 07/02/03 140,900 4980 235 3.75 28 07/02/03 136,900 4840 28-Day Average 49J-0 400O TECHNICIAN: DISTRIBUTION: CBC (10:30am-12:30pm) (1) Pavement Services Corp. (1) City of Coppeli 2870 Walnut Hill Lane Dallas, Texas,75229 (214) 351-6419 Fax (214) 351-5148