Loading...
MA 02/03-LR030602Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 2 June 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving in alley behind house @ 104 Simmons LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MiX NO. Truck No. 165 Cement Ticket No. 13614109 Flyash Time Batched 10:29am Sand Time Sampled 11:25am in. Concrete Temp. [ASTM C1064) 85°F 1.0 in. Air Content IASTM C231) 3.3% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Da¥ (ASTM C 143) psi Strength 224 5.00 7 06~09~03 225 5.00 7 06~09~03 226 5.00 14 06/16~03 227 5.00 14 06/16/03 228 5.00 28 06/30/03 229 5.00 28 06/30/03 107,400 3800 113,800 4030 124,800 4410 124,600 4410 128,400 4540 129,600 4580 28-Day Average 4560 4OOO TECHNICIAN: DISTRIBUTION: GB (10:30am-12:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148