Loading...
MA 02/03-LR030528Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 28 May 2003 PROJECT: City of Coppell Street Repair Project Job //03-007, Coppell, TX JOB NO.: 02.1077 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120,0 pcf @ 11.0% Moisture MOISTURE LOCATION PROCTOR LIFT CONTENT % Alley Pavin¢~ Replacement (~ 445 Sandy Knoll Dr. 118) approx, 75' north of south end 1 119) middle of north radius 1 120) 30' east of Sandy Knoll Drive 1 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % CTB 8.8 115.2 96.0 CTB 6.9 124.0 103.0 CTB 7.7 125.5 104.6 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148