MA 02/03-LR030527Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT; Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project, Job 03-007
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
JOB NO.: 02.1077
DATE: 27 May 2003
SUPPLIER: Beall
Paving, alley behind 462 Clear Creek
SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504
Truck No. 207 Cement
Ticket No. 13613829 Flyash
Time Batched 11:57am Sand
Time Sampled 12:45pm in.
Concrete Temp. (ASTM C1064) 84°F 1.0 in.
Air Content (ASTM C231) 3.0% Water
Unit Weight (ASTM C135) Admix #1
Admix #2
AEA
COMPRESSIVE STRENGTH TESTS IASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143} psi Strength
212 4.50 7 05/30/03 109,900 3890
213 4.50 7 05/30/03 114,100 4040
214 4.50 14 06/06/03 ]..17,9Q0 4.[7Q
215 4.50 14 06/06/03 :[:Z:[, 9QCL 4310
216 4.50 28 06/20/03
217 4.50 28 06/20/03
28-Day Average 4000
TECHNICIAN:
DISTRIBUTION:
TMC (12:00 Noon-2:00pm)
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148
Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 27 May 2003
PROJECT: City of Coppell Street Repair Project
Job //03-007, Coppell, TX
JOB NO.: 02.1077
MATERIAL DESCRIPTION:
ASTM D 698 STANDARD PROCTOR:
LOCATION PROCTOR
MOISTURE DRY PERCENT REQUIRED
LIFT CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Trip charge ony, Contractor not ready for density testing. No lab, notification.
TECHNICIAN: CDJ
DISTRIBUTION: (1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148