Loading...
MA 02/03-LR030527Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT; Pavement Services Corp. PROJECT: City of Coppell Street Repair Project, Job 03-007 LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 27 May 2003 SUPPLIER: Beall Paving, alley behind 462 Clear Creek SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 207 Cement Ticket No. 13613829 Flyash Time Batched 11:57am Sand Time Sampled 12:45pm in. Concrete Temp. (ASTM C1064) 84°F 1.0 in. Air Content (ASTM C231) 3.0% Water Unit Weight (ASTM C135) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143} psi Strength 212 4.50 7 05/30/03 109,900 3890 213 4.50 7 05/30/03 114,100 4040 214 4.50 14 06/06/03 ]..17,9Q0 4.[7Q 215 4.50 14 06/06/03 :[:Z:[, 9QCL 4310 216 4.50 28 06/20/03 217 4.50 28 06/20/03 28-Day Average 4000 TECHNICIAN: DISTRIBUTION: TMC (12:00 Noon-2:00pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 27 May 2003 PROJECT: City of Coppell Street Repair Project Job //03-007, Coppell, TX JOB NO.: 02.1077 MATERIAL DESCRIPTION: ASTM D 698 STANDARD PROCTOR: LOCATION PROCTOR MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % Trip charge ony, Contractor not ready for density testing. No lab, notification. TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148