MA 02/03-LR030519Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 19 May 2003
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
JOB NO.: 02.1077
MATERIAL DESCRIPTION: 1 ) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture
112)
113)
114)
LOCATION PROCTOR LIFT
Pavinq Replacement ~ 955 Freeport
Pkwy., Southbound Outside Lane
approx. 20' south of north end
approx. 50' north of south end
approx. 15' north of south end
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
1 CTB 11.5 114.8 95.7
1 CTB 11.3 114.7 95.6
1 CTB 8.3 121.1 101.0
95+
TECHNICIAN: CDJ
DISTRIBUTION: (1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148