Loading...
MA 02/03-LR030519Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 19 May 2003 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX JOB NO.: 02.1077 MATERIAL DESCRIPTION: 1 ) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture 112) 113) 114) LOCATION PROCTOR LIFT Pavinq Replacement ~ 955 Freeport Pkwy., Southbound Outside Lane approx. 20' south of north end approx. 50' north of south end approx. 15' north of south end MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 CTB 11.5 114.8 95.7 1 CTB 11.3 114.7 95.6 1 CTB 8.3 121.1 101.0 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148