Loading...
MA 02/03-LR030514Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 14 May 2003 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX JOB NO.: 02.1077 MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf L~ 11.0% Moisture LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Alley Paving Behind 103 Maple Leaf 106) §' south of Sugarberry Dr. 1 Final 9.8 123.0 102.5 107) 30' south of Sugarberry Dr. 1 Final 10.6 122.0 101.7 108) 50' south of Sugarberry Dr. 1 Final 9.3 119.5 99.6 Alley Paving Behind 900 Tupelo Drive 109) 5' east of Spring Oak Lane 1 Final 9.0 110) 15' east of Spring Oak Lane 1 Final 10.3 111) 30' east of Spring Oak Lane 1 Final 8.9 122.3 101.9 120.1 100.1 120,2 100.2 95+ TECHNICIAN: MFM (2 trips) DISTRIBUTION: (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 14 May 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, alley behind 103 Mapleleaf Lane, approx. 20'-50' south of Sugarberry Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 124 Cement Ticket No. 89025989 Flyash Time Batched 11:46am Sand Time Sampled 12:38pm in. Concrete Temp. {ASTM C1064) 88°F 1.0 in. Air Content (ASTM C231 ] 3.9 % Water Unit Weight (ASTM C13B) Admix #1 Admix #2 AEA 340L1504 COMPRESS/VE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C143) ps1 Strength 194 5.50 7 05/21/03 195 5.50 7 05/21/03 196 5.50 14 05~28~03 197 5.50 14 05/28/03 198 5.50 28 06/11/03 199 5.50 28 06/11/03 111,200 3930 114,600 4050 ~$1,30Q 4640 127,500 4510 138,800 4910 137,600 4870 28-Day Average 4890 4000 TECHNICIAN: DISTRIBUTION: MFM (12:00N-2:00pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148