Loading...
MA 02/03-LR030509Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 9 May 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, alley behind223 Creekside, from Autumn St. 50'-80' south LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 232 Cement Ticket No. 13613300 Flyash Time Batched 12:44pm Sand Time Sampled 1:5Opm in. Concrete Temp. (ASTM C1064) 93°F 1 .O in. Air Content {ASTM C231) 4.6% Water Unit Weight (ASTM C1381 Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 182 5.00 7 05/16/03 105,500 3730 183 5.00 7 05/16/03 109,200 3860 184 5.00 14 05/23/03 113,900 4030 185 5.00 14 05/23/03 3.16,400 4120 186 5.00 28 06/06/03 154,10Q 4740 187 5.00 28 06106/03 ].:Z9,800 4590 28-Day Average 4670 4OOO TECHNICIAN: DISTRIBUTION: EWM (l:30pm-3:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148