Loading...
MA 02/03-LR030502Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO,: 02.1077 CLIENT: Pavement Services Corp. DATE: 2 May 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, alley behind 462 Clear Creek LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 207 Cement Ticket No. 13613829 Flyash Time Batched 11:57am Sand Time Sampled 12:45pm in. Concrete Temp. IASTM C1064) 84°F 1.0 in. Air Content (ASTM C231} 3.0% Water Unit Weight (ASTM C13B) Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day (ASTM C 143} psi Strength 212 4.50 7 05/30/03 213 4.50 7 05/30/03 214 4.50 14 06/06/03 215 4.50 14 06/06/03 216 4.50 28 06/20/03 217 4.50 28 06/20/03 109,900 3890 114,100 4040 117,9Q0 417Q 121,9QQ 4310 138,400 4900 136,700 4840 28-Day Average 4570 4000 TECHNICIAN: DISTRIBUTION: TMC (12:00 Noon-2:0Opm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148