Loading...
MA 02/03-LR030430Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 30 April 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPMER: Beall LOCATION OF POUR SET 1: Paving, eastbound lane of Parkway, apparox. 20'-40' east of Moore St. LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 230 Cement Ticket No. 89025043 Flyash Time Batched 10:45am Sand Time Sampled 11:20am in. Concrete Temp. {ASTM C1064) 80°F 1.0 in. Air Content (ASTM C231) 4.2% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 152 6.00 7 05/07/03 153 6.00 7 05/07/03 154 6.00 14 05/14/03 155 6.00 14 05/14/03 156 6.00 28 05/28/03 157 6.00 28 05/28/03 108,100 3820 106,500 3770 120,800 4270 112,600 3980 137,300 4860 132,900 4200 28-Day Average 4780 4OOO TECHNICIAN: DISTRIBUTION: EWM (10:00am-12:00 Noon) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148