Loading...
MA 02/03-LR030424Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 24 April 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Alley paving replacement between Cherrybark Dr. & Mesquitewood St. off Hill Dr., from approx. 60' E of W end to approx. 110' E of W end LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 220 Cement Ticket No. 13612599 Flyash Time Batched 9:35am Sand Time Sampled 10:4Earn in. Concrete Temp. IASTM C1064] 83°F 1.0 in. Air Content IASTM C231) 5.0% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 COMPRESS/VE STRENGTH TESTS tASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143] psi Strength 134 5.75 7 05~01103 135 5.75 7 05/01/03 136 5.75 14 05/08/03 137 5.75 14 05/08/03 138 5.75 28 05/22/03 139 5.75 28 05/22/03 107,100 3790 100,700 3560 112,400 3980 121,600 4300 126,600 4480 128,500 4550 28-Day Average 4520 4000 TECHNICIAN: DISTRIBUTION: CDJ (9:30am-11:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148