MA 02/03-LR030422Hooper Engineering Laboratories, Inc.
CLIENT:
PROJECT:
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
Pavement Services Corp.
City of Coppell Street Repair Project
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf (~ 11.0% Moisture
DATE: 22 April 2003
LOCATION PROCTOR LIFT
JOB NO.: 02.1077
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
Alley Pavin¢l Replacement Between
Cherrybark Dr. & Mesquitewood Dr.
80) approx, 10' W of E existing paving 1 CTB 10.8
81) approx. 75' W of E existing paving 1 CTB 10.9
82) approach from Hill Dr. 1 CTB 10.6
122.9 102.4
127,3 106.6
122,9 102.4
95+
TECHNICIAN:
DISTRIBUTION:
CDJ
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148