Loading...
MA 02/03-LR030418Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppetl Street Repair Project, Job 03-007 LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 18 April 2003 SUPPLIER: Beall Paving, westbound lane of Southwestern in front of Fire Station //1 SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 231 Cement Ticket No. 88015732 Flyash Time Batched 9:19am Sand Time Sampled 9:50am in. Concrete Temp. (ASTM C1064) 75°F 1.0 in. Air Content (ASTM C2311 4.4% Water Unit Weight (ASTM C138} Admix #1 Admix #2 AEA COIVIPRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day ASTM C143) psi Strength 128 5.00 7 04/25/03 122,000 4320 129 5.00 7 04/25/03 121,400 4290 130 5.00 14 05~02~03 127,600 45_[0 131 5.00 14 05/02/03 -[32,300 4680 132 5.00 28 o5/16/o3 -~47, ~.Q0 5200 133 5.00 28 05/16~03 .149,900 5300 28-DayAverage 5250 4aaa TECHNICIAN: DISTRIBUTION: EWM (9:00am-11:OOam) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas,,Texas 75229 (214) 351-6419 Fax (214) 351-5148