Loading...
MA 02/03-LR030416CLIENT: PROJECT: Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job /103-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf ~ 11.0% Moisture DATE: 16 April 2003 JOB NO.: 02.1077 LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % Westbound Lane ~, 520 Southwestern Blvd. 77) west end 1 Final 17.2 78) center 1 Final 9.4 79) east end 1 Final 8.3 119.7 99.8 122.8 102.3 121.2 101.0 95+ TECHNICIAN: MFM DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148