Loading...
MA 02/03-LR03041574) 75) 76) Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture LOCATION PROCTOR Alley Pavin¢l Replacement - 400 Block Phillips Drive @ 457 Phillips Drive @ 461 Phillips Drive DATE: 15 April 2003 JOB NO.: 02.1077 MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % @ 465 Phillips Drive 1 CTB 8.9 129.6 108.0 1 CTB 8.3 129.5 107.9 1 CTB 9.3 130.0 108.3 95+ TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148