Loading...
MA 02/03-LR030408Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 8 April 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, alley approach in between 103 & 105 Hill Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 190 Cement Ticket No. 13611897 Flyash Time Batched 10:57am Sand Time Sampled 11:30am in. Concrete Temp. {ASTM C1064} 73°F 1.0 in. Air Content (ASTM C231} 4.3% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS (ASTir1 cag) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 116 5.50 7 04/15~03 95,400 3370 117 5.50 7 04/15~03 96,900 3430 118 5.50 14 04/22/03 112,3Q0 39~70 119 5.50 14 04/22/03 10.7,800 5810 120 5.50 28 05/06/03 129,100 457Q 121 5.50 28 05/06/03 128,60Q 455Q 28-Day Average 4560 4OOO TECHNICIAN: DISTRIBUTION: CBC (11:00am-1:OOpm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148