Loading...
MA 02/03-LR030512Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 12 May 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving @ 955 Freeport Pkwy., southbound right lane from 10'-50' south of main entry drive to east parking area LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck Ne. 235 Cement Ticket No. 13613354 Flyash Time Batched 12:46pm Sand Time Sampled 1:20pm in. Concrete Temp. IASTM C1054) 85°F 1.0 in. Air Content (ASTM C231) 4.8 % Water Unit Weight IASTM C138) Admix #1 Admix #2 AEA 340L15O4 COMPRESSIVE STRENGTH TESTS {ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143J psi Strength 188 4.50 7 05/19~03 189 4.50 7 05/19~03 190 4.50 14 05~26~03 191 4.50 14 05/26/03 192 4,50 28 06/09/03 193 4.50 28 06/09/03 120,800 4270 123,600 4370 131,600 4660 139,108 4920 142,200 5030 146,800 5190 28-Day Average 5~0 4OOO TECHNICIAN: DISTRIBUTION: MFM (12:30pm-2:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148