Solomon Dental-LR 990315IN-PLACE DENSITY TESTING
Date of Service: 02/24/1999
Client No.: 81986000
Client: Structures & Interiors
Attn: Mike Lese
2855 Exchange Blvd., Suite 300
Southlake, TX 76092
Services: In-place density testing.
8901 Carpenter Frwy., Suite#100
Dallas, Texas 75247
Report No.: 9906008
Project No.: 43-2560-98
Report Date
03/15/1999
Project: Dr. Glynn Solomon Dental Off.
188 W. Parkway Blvd.
Coppell, Texas
co~rr~cxog: Structures & Interiors
PROJECT DATA
Laboratory Test Method:
ASTM D-698
MOISTURE DENSITY RELATIONS:
MID No.
Field TestMethod:
Description Moisture % Density pcf
ASTM D-2922
ASTM D-3017
Project Requirements
Moisture Density
Med brown & tan shaley clay 23.5 94.5
FIELD DENSITY TESTS
-1/+3% 95%
TEST
NO
M/I) MOISTURE
TEST LOCATION No. (%)
DRY DENSITY DENSITY
(pcf) (% max)
Parking, Final Grade
S entrance approach, center of approach 1 24.1
Test results on this report meet project specification.
92.0 97
Technician: Lewis Jones
Report Distribution:
(4) Structures & Interiors
( I ) City of Coppell
(I) City of Coppell
~ En~'~ing, Inc.
Paul D. Smith, P.E.
Senior Project Engineer
This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac.
07SS Page l of 1