Loading...
Solomon Dental-LR 990315IN-PLACE DENSITY TESTING Date of Service: 02/24/1999 Client No.: 81986000 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Services: In-place density testing. 8901 Carpenter Frwy., Suite#100 Dallas, Texas 75247 Report No.: 9906008 Project No.: 43-2560-98 Report Date 03/15/1999 Project: Dr. Glynn Solomon Dental Off. 188 W. Parkway Blvd. Coppell, Texas co~rr~cxog: Structures & Interiors PROJECT DATA Laboratory Test Method: ASTM D-698 MOISTURE DENSITY RELATIONS: MID No. Field TestMethod: Description Moisture % Density pcf ASTM D-2922 ASTM D-3017 Project Requirements Moisture Density Med brown & tan shaley clay 23.5 94.5 FIELD DENSITY TESTS -1/+3% 95% TEST NO M/I) MOISTURE TEST LOCATION No. (%) DRY DENSITY DENSITY (pcf) (% max) Parking, Final Grade S entrance approach, center of approach 1 24.1 Test results on this report meet project specification. 92.0 97 Technician: Lewis Jones Report Distribution: (4) Structures & Interiors ( I ) City of Coppell (I) City of Coppell ~ En~'~ing, Inc. Paul D. Smith, P.E. Senior Project Engineer This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, lac. 07SS Page l of 1