Loading...
Solomon Dental-LR 990308CONCRETE COMPRESSIVE STRENGTH TEST Date of Service: 02/03/1999 Client No.: 81986000 Report No,: 9903926 Project No.: 43-2560-98 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Report Date 03/08/1999 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Project: Dr. Glynn Solomon Dental Off. 188 W. Parkway Blvd. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Structures & Interiors CONCRETE CLASS: 9331 CONCRETE SUPPLIER: MCR PLACEMENT DATE: 02/03/1999 BATCHTIME: 2:02pm PLA~r: N/A TIME SAMPLED: 3:30pm RY: Melvin Searles SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: 'Clear and warm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 50 F SLtrMP: 4.0" Max TRUCKNO: 551 TICKETNO: 51596 AIR: N/A AIRCONTENT(%): N/A UNITWEIGHT(pcf): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Sidewalks ASTM O172 ASTM C-39 SAMPLE LOCATION: 6' E of E approach off' Parkway Bird REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 4.00 02/10/1999 7 65000 2300 1 2 4.00 02/10/1999 7 61620 2180 Average 2240 1 3 4.00 03/03/1999 28 98510 3480 1 4 4.00 03/03/1999 28 108410 3830 Average 3660 Sample taken from truck discharge, concrete truck one (1) hour late. Technician: Melvin Searles Report Distribution: (4) Structures & Interiors (1) City of Coppell (1) City of Coppell Started: l:30pm Finished: 4:30pm ~l a.~.~~En ' ng, Inc. Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 1