Loading...
PA9702-LR 990625 (2)CONCRETE COMPRE IVE STRENGTH TES ( 8901 Carpen~r Frwy., Suite #100 Dallas, Tsar* 75247 Date of Service: 06/14/1999 Report No.: 9916284 Report Date 06f25/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~FReid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 0~/14/1999 BATCHTIME: ll:44am PLANT: Lcwisville T~E SAMPLEa: 12:35pm BY: Mike Odom SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - Am 85 F CONCRETE: 85 V SLtnVW: 4-6" TRUCK NO: 217 T~CKETNO: 73398 Ant: N/A AreCONTENT(%): N/A UNffWEIGnT(pet): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Picr information mKl tw, lmician time: See Rcport ~'f~916283 ASTM C-172 ASTM C-39 SAMPLE LOCATION: B.I 2 6, 18 REPORT OF TESTS ACCUS TB YARNS: 5o CYLINDER MEASURED MAXIMUM COMPRF.~SIYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACITtIRE SET NO. (inches) TESTED (days) (lbs. foree) (psi) TYPE I 1 4.50 06/21 / 1999 7 112260 3970 1 2 4.50 06/21/1999 7 110950 3920 Avenge 3950 1 3 4.50 07/12/1999 28 1 4 4.50 07/12/1999 28 Technidan: Mike Odom Started: 12:00pro Finished: 5:00pm ~ ~ F,n ° co Report Distribution: (l) City of Copgelt (1) City ofCoppeU - Engineering (I) Btinldey Sargent Architects (1) City of Copp~ll - Bldg. Insp. Eugene I-Iarbour ( 1 ) Turaet Engineers ( I ) City of Coppell - Leisure Serv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the elicat indicated above and shall not be reproducca except in full without the written approval of HBC Enginefling, inc. 0ILL Page I of I