PA9702-LR 990625 (2)CONCRETE COMPRE IVE STRENGTH TES (
8901 Carpen~r Frwy., Suite #100
Dallas, Tsar* 75247
Date of Service: 06/14/1999 Report No.: 9916284 Report Date
06f25/1999
Client No.: COPPELL Project No.: 94991118
Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr
Attn: Bra~FReid
732 DeForest 300 Block of Parkway Blvd
Coppell TX 75019 Coppell, Texas/Prj. #96051
Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast
compressire strength samples.
PROJECT DATA
CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: 6 Sack
CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 0~/14/1999 BATCHTIME: ll:44am
PLANT: Lcwisville T~E SAMPLEa: 12:35pm BY: Mike Odom
SPECIFICATION REQUIREMENTS WEATHER CONDrrIONS: Partly cloudy
STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - Am 85 F CONCRETE: 85 V
SLtnVW: 4-6" TRUCK NO: 217 T~CKETNO: 73398
Ant: N/A AreCONTENT(%): N/A UNffWEIGnT(pet): N/A
TEST METHOD: ASTM C- 143 PLACEMENT LOCATION:
Picr information mKl tw, lmician time: See Rcport ~'f~916283
ASTM C-172
ASTM C-39
SAMPLE LOCATION: B.I 2 6, 18
REPORT OF TESTS ACCUS TB YARNS: 5o
CYLINDER MEASURED MAXIMUM COMPRF.~SIYE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACITtIRE
SET NO. (inches) TESTED (days) (lbs. foree) (psi) TYPE
I 1 4.50 06/21 / 1999 7 112260 3970
1 2 4.50 06/21/1999 7 110950 3920
Avenge 3950
1 3 4.50 07/12/1999 28
1 4 4.50 07/12/1999 28
Technidan: Mike Odom Started: 12:00pro Finished: 5:00pm ~ ~
F,n ° co
Report Distribution:
(l) City of Copgelt (1) City ofCoppeU - Engineering
(I) Btinldey Sargent Architects (1) City of Copp~ll - Bldg. Insp. Eugene I-Iarbour
( 1 ) Turaet Engineers ( I ) City of Coppell - Leisure Serv Dept Vice President
(I) Hisaw & Associates
This report is exclusively for the use of the elicat indicated above and shall not be reproducca except in full without the written approval of HBC Enginefling, inc.
0ILL Page I of I