Solomon Dental-LR 990218,CONCRETE COMPRESSIVE STRENGTH TEST ENGINEERING, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/19/1999 Client No.: 81986000 Report No.: 9902491 Project No.: 43-2560-98 Report Date 02/18/1999 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Project: Dr. Glynn Solomou Dental Off. 188 W. Parkway Blvd. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METltOD: CONTRACTOR: Structures & Interiors CONCRETE SUPPLIER: Mid-Cities PLANT: A SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA ('ONCRETE CLASS: 9355 PLACEMENT DATE: 01/19/1999 BATCIt TIME: 8:30am TIME SAMPLED: 10:24am BY: Barry Cuble WEATHER CONDITIONS: Sunny, mild IEMPERATURE IF)- AIR 55 F CONCRETE: 62 F TRUCKNO: 392 TICKETNO: 50873 AIR CONTENT (%): 4.5 UNITWEIGItT(pc0: N/A PLACEMENT LOCATION: Paving: Southwest parking & fire lane SAMPLE LOCATION: 15' W of E curb, Iff S of N curb CYLINDER MEASURED MARKED SLUMP DATE SET NO. (inches) TESTED I I 6.75 01/26/1999 I 2 6.75 01/26/1999 I 3 6.75 02/16/1999 1 4 6.75 02/16/1999 REPORT OF TESTS ACCUMULATIVE YARDS: 30 MAXIMUM COMPRESSIVE AGE LOAD STRENGTH (days) (lbs. ~rce) (psi) 7 80650 2850 7 89890 3180 Average 3020 28 122860 4340 28 118530 4190 Average 4270 Note: Ail water added by contractor. placement. FRACTURE TYPE Contractor was informed of slump prior to This report is exclusively lbr the use hi'the client mdicaled above and shall not be reproduced except in lhll without the written approval of I IBC Engineering, Inc. OILL Page I of 2 CONCRETE COMPRESSIVE STRENGTH TEST ENGINEF_RllqG, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/19/1999 Client No.: 81986000 Report No.: 9902491 Project No.: 43-2560-98 Report Date 02/18/1999 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Project: Dr. Glynn Solomon Dental Off. 188 W. Parkway Blvd. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Structures & Interiors CONCRETE SUPPLIER: Mid-Cities PLANT: A SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 3-5" 3-6% ASTM C-143 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 80' W of E curb, 20' S of N curb CYLINDER MEASURED MARKED SLUMP SET NO. (inches) PROJECT DATA CONCRETE CLASS: 9355 PI,ACEMENT DATE: 01/19/1999 BATCh TIME: 1 l:54am TIME SAMPLED: I2:36pm BY: Barry Cubic ~VEATHERCONDITIONS: Sunny, mild TEMPERATURE (F)- AIR 68 F CONCRETE: 70 F TRUCK NO: 758 TICKET NO: 50894 AIR CONTENT (%): 4.7 UNITWEIGIIT(pcl): N/A PLACEMENT LOCATION: See page I REPORT OF TESTS ACCUMULATIVE YARDS: 120 MAXIMUM COMPRESSIVE DATE AGE LOAD STRENGTH FRACTURE TESTED (days) (lbs. force) (psi) TYPE 2 1 6.00 2 2 6.00 2 3 6.00 2 4 6.00 01/26/1999 7 86310 3050 01/26/1999 7 88770 3140 Ave rage 3100 02/16/1999 28 118110 4180 02/16/1999 28 126860 4490 Average 4340 Technician: Barry Cuble Report Distribution: (4) Structures & Interiors (1) City of Coppell (1) City of Coppell Started: 8:00am Finished: l:30plll H~ E n gin e~c~.' Eugene Harbour Vice President This report is exclusively Ibr the use ol the client indicated above and shall not be reproduced excep 'u xv hout the written approval of IIBC Engineering, Inc. 0ILL Page 2 of 2