Loading...
Solomon Dental-LR 990202· CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 01/19/1999 Client No.: 81986000 Report No.: 9902491 Project No.: 43-2560-98 Report Date 02/02/1999 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Project: Dr. Glynn Solomon Dental Off. 188 W. Parkway Blvd. Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLWMP: AIR: TEST METHOD: com~scxom Structures & Interiors CONCRETE SUPPLIER: Mid-Cities PLANT: A SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C-172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9355 PLACEMENT DATE: 01/19/1999 BATCH TIM~: 8:30am TIME SAMPLED: 10:24am BY: Barry Cuble WEATHER CONDITIONS: Sunny, mild TEMPERATURE (FI - AIR 55 F CONCRETE: 62 E TRUCKNO: 392 TICRET NO: 50873 AmcoNTENT(%): 4.5 UNIT WEIGHT (pcf): N/A PLACEMENT LOCATION: Paving: Southwest parking & fire lane SAMI~LE LOCATION: 15' W of E curb, 10' S of N curb CYLINDER MARKED SET NO. REPORT OF TESTS ACCUMIJLATIVEYARDS: 30 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) (lbs. force) (psi) TYPE I 1 6.75 01/26/1999 7 80650 2850 I 2 6.75 01/26/1999 7 89890 3180 Average 3020 1 3 6.75 02/16/1999 28 1 4 6.75 02/16/1999 28 Note: All water added by contractor. Contractor was informed of slump prior to placement. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page I of 2 · CONCRETE COMPRESSIVE STRENGTH TEST 8901 Carpenter Frwy., Suite #100 Dallas, Tex~s 75247 Date of Service: 01/19/1999 Client No.: 81986000 Report No.: 9902491 Project No.: 43-2560-98 Report Date 02/02/1999 Client: Structures & Interiors Attn: Mike Lese 2855 Exchange Blvd., Suite 300 Southlake, TX 76092 Project: Dr. Glynn Solomon Dental Off. 188 W. Parkway Blvd, Coppell, Texas Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. STRENGTH: SLUMP: AIR: TEST METHOD: CONTRACTOR: Structures & Interiors CONCRETE SUPPLIER: Mid-Cities PLANT: A SPECIFICATION REQUIREMENTS 4000 psi @ 28 Days 3-5" 3-6% ASTM C- 143 ASTM C- 172 ASTM C-39 PROJECT DATA CONCRETE CLASS: 9355 PLACEMENT DATE: 01/19/1999 RATC~I Tram: 1 l:54am T~M~ SAM~LEO: 12:36pm BY: Barry Cuble WEATHER CONDITIONS: Sunny, mild TEMPERATURE (F) - AIR 68 F CONCRETE: 70 F TRVC~ NO: 758 TICKET NO: 50894 AmcoNT~NT(%): 4.7 UNIT WEIGHT (i~f): N/A PLACEMENT LOCATION: See page I SAMPLE LOCATION: 80' W of E curb, 20' S of N curb CYLINDER MEASURED MARKED SLUMP SET NO. (inches) REPORT OF TESTS MAXIMUM DATE AGE LOAD TESTED (days) (lbs. force) ACCUMULATIVE YARDS: 120 COMPRESSIVE STRENGTH FRACTURE (psi) TYPE 2 1 6.00 2 2 6.00 2 3 6.00 2 4 6.00 01/26/1999 7 86310 3050 01/26/1999 7 88770 3140 Average 3100 02/16/1999 28 02/16/1999 28 Technician: Barry Cuble Report Distribution: (4) Structures & Interiors ( 1 ) City of Coppell ( 1 ) City of Coppcll Started: 8:00am Finished: l:30pm Eugene Harbour Vice President This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, [nc. 0ILL Page 2 of 2