Lauren Estates-CS000315The City With A Beautiful Future
P.O BOX 478
COPPELL, TEXAS 75019
P,O. Box 478
Coppell, Texas 75019
972-462-0022
March 15, 2000
Dewayne Randle
4012 Hackmore Loop
Irving, Texas 75061
RE: Lauren Estates
Final Acceptance
Dear Mr. Randle:
A final inspection of paving and utilities for the referenced project has been confirmed by
representatives of the City of Coppell.
The two-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be two years from the date of this letter. Maturity on the Erosion
Control Bond will also be two years from the date of this letter.
Sincerely,
Larry Davis
Construction Inspector
CC:
Mike Martin, Assistant City Engineer
Debi Ingram, Engineering Secretary
Glenn Hollowell, Director of Public Works
Greg Jones, Chief Building Official
Travis Crump, Fire Marshal
MAINTENAN~ BOND
BOND NO.:
BCN-1046743
That, U-CON CONSTRUCTION, INC.
1506 Ross Drive, Irving, Texas 75061 as Principal, and
BITUMINOUS CA~UA/~TY CORPORATION, a corporation organized under the Laws-
of the StaUe of Illinois and authorized to do a surety business in the
State of Texas, with office at 222 W. Las Colinas Blvd., Sra. 750,
Irving, Texas 75039, as surety, are held and firmly bound unto the
CITY OF COPPELL
255 Parkway Blvd., Coppell, Texas 75019
in the sum of Eight Thousand Twenty-Five Dollars and no/cents**********
********************************************** ), lawful money of the
United States of America, for the payment of well and truly to be made,
we bind ourselves, cur heirs, executors, administrators, successors and
assigns, ~ointly and severally, firmly by these present:
SEALED with our seals and dated this 19'th of August 1999
WHEREAS, cn the 19'th of July 1999 the said
U-CON CONSTRUCTION~ INC.
as contractor, entered into a contract for
Water And Sewer Taps
Lauren Estates, Lots 1 And 2R
Moore Road
Coppell, Texas
for the sum of Eight Thousand Twenty-Five Dollars and'no/cents*********
******************************************* 8,025.00 ); and,
W~REAS, under the terms of the specifications for said work, the
said U-CON CONSTRUCTION, INC.
is required to give a bond for Eight Thousand Twenty-Five Dollars and nu
**************************************************************** ),
protect the CITY OF COPPELL
against the result of faulty materials or workmanship for a period of
2 ~Two) year(s) from and after the date of the
completion and acceptance of same namely until 19'th of August 2001
NOW T~EP. EFOP. E, if the said U-CON CONSTRUCTION, INC.
shall for a period of
2 (Two) years(s) from and after the date
of =he completion and acceptance of same by CITY OF COPPELL
said replace any and all defects arising in said work
whether resul~ing~pm defective materials or defective workmanship,
the above obligation to be void; otherwise to remain in full force and
effect.
O-CON CONSTRUCTION, INC.
BITUMINOUS CA~UALT~ COKPORA~ION
Charles K. Miller Attorney In Fact
Membe~aftheOTdRepubliclnsu~nceG~u~
BITUICNOg8 C~t~¢OP~ORA330~ o~ S~tember I ~. ....... -=_--~- t~-
- ~; ~ ..... -. - _
and
~N ~t'VITNESS