Loading...
SS9901-CS040908,:M a sTe c gcplember g. 2004 City of Coppell Bore on M~cArthur Station 39+71 to 47+73(802~) Change Order Moving Blare Rig North fi)r next bm'e ( Make bore north It~ smith) MasTec North America. Inc. will shorten this bore t?mn~ 1300' to 802' ;and move tile bore rig north. This will move thc bore rig and associated equipment away from the area it is in now and away IYom the residents that arc complaining about the sound/vibration · issues. We will still need to have a rccycler at thc same location it is at now (39+71). By shorlening this bore we will also be ~hortening thc Icnglh el' time spent at this locatkm. Also, by moving north and shorlening this bore wc wJ}l not be aft~cting the crosswalk at l,~}gtma. MasTec North America, Inc. is requesting that thc City of Coppell work on closing Parkway Blvd. during the week to pull pipe on this bore. This will allow MasTec North America, lnc, lo pull pipe ripen completion of the bore and n.t have to wait for weekends. If Parkway Bird cannot be closed during the week and MasTec North America. Inc. has to wait fi'n- a weekend this will Icud to additional cost in downtime. Mas'lee North America, Inc. is also requesting that the Ch? ,~1' Coppell ctmsider shallowing the remaining bores where possible to expedite this proiect. 17,5' moving north this will be an added pit location. Which will afli~ct our restoration and r~.'quire additional compensat.itm fey that rcstoratitm The ad,.litimml cost for sod arid rest,ration will Dc a tmal ors 5.201).00. If you have any qucsthms please call me at 214-571-2568(officc~ .r 214-543-4934(ce11). 'J'hank you for your assistance in this mi[ttcr. David 1 Iolland ,qcnior Vice Prcsidenl MasTec North America. Inc.