SS9901-CN050126 T H E C I T Y 0 F COPPELL January 27, 2005 David Holland, Sr. Vice President MasTec North America, Inc. 4747 Irving Blvd., Suite 221 Dallas, TX 75247 FAX 214/571-2565 Deforest Road Lift Station Improvements Force Main Line "D" Project # SS 99-01 Change Order # 4 Dear Mr. Holland: Attached are three original Charge Order # 4 documents for the restoration of the nursery property on the referenced project. Please execute the documents and return two of the originals to me. One of the originals is for your file. If you have any questions please feel free to give Rick O'Dell, Constraction Inspector, a call at 972/304-7090. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041 E-mail kgriffin~ci.coppell.tx.us CITY OF COPPELL CHANGE OR EXTRA WORK ORDER PROJECT: CONTRACTOR: OWNER: CHANGE ORDER NO.: Deforest Road Lift Station Improvements Force Main Line D MasTec North America, Inc. City of Coppell Four (4) DATE: 1/26/05 Add: Add: Item Description Quantity Unit Unit Price Flanges, D-rings, Bolts, Nuts & 1 LS 6,800 Washers Flex Base for Restoration of Nursery 1 LS 2,831 Property Total 6,800.00 2,831.00 Total Revision to Contract Amount $9,631.00 Original contract amount Net increase in contract amount Change Order #1 Net decrease in contract amount Change Order #2 Net Increase in contract amount Change Order #3 Net Increase in contract amount Change Order #4 Revised contract amount Net increase in contract time of completion Revised Contract time of completion $ 2,364,835.54 $1,350~00 ($ 32,330~70) $ 5,907.00 $ 9,631.00 $ 2,349,392.84 N/A N/A The contractor hereby accepts this Contract adjustment as a final and complete adjustment in full accord and satisfaction of all past and future liability originating under any clause in the Contract by reason of thi~rsvision to the Contract., R~commend~d by City Engineer tJate Ac~/~ by City Date Ag~e~'~ t~ b'y Contractor Date · a sTe c January 20, 2005 Mr. Ken Griffin, P.E. City Engineer City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Re: DeForest Rd. Lift Station Improvements Force Main Line D Change Order No. 4 Dear Mr. Griffin: Pursuant to your request regarding the use of 30' HDPE by open cut in lieu of 30" HDPE by directional drilling between Sra. 4+39+/- and Sta. 6+93+/- across the nursery property we otter the following information for your review. The additional cost is a result of the additional flange adapters, D-rings, bolts, nuts and flex base required to restore the nursery property. Additional Flanges, D-rings, Bolts, Nuts & Washers Flex Base For Restoration Net Increase In Contract Amount 6,800.00 2,831.00 9,631.00 Respectfully submitted, Mastec North America Robbie Dupree Operations Manager · ', MasTec North America, Inc 4747 Irving Blvd Suite 221 Dallas, Texas 75247 · 2145712500 fax2145712555 wwwmasteccom · :-M a sTe c January 20, 2005 Mr. Ken Griffin, P.E. City Engineer City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Re: DeForest Rd. Lift Station Improvements Force Main Line D Change Order No. 4 Dear Mr. Griffin: Pursuant to your request regarding the use of 30" HDPE by open cut in lieu of 30" HDPE by directional drilling between Sta. 4+39+/- and Sta. 6+93+/- across the nursery property we offcr the tbllowing information for your review. We propose to furnish and install 30" HDPE by open cut in lieu of 30" HDPE by directional drilling for the following unit price. The increase in the cost of the open cut HDPE is a result of additional flanges, D- rings, bolts, nuts, washers, fusion welds, flex base restoration and concrete channel repair. ADD 30" HDPE By Open Cnt 254 LF 302.40 76,809.60 DELETE 30" ~IDPE By Directional Drilling 254 LF 221.40 (56,235.60) Net Increase In Contract Amount David Holland Senior Vice President 20,574.00 · a sTe c December 15, 2004 Mr. Ken Griffin, P.E. City Engineer City of Coppell, Texas 255 Parkway Blvd. Coppell, Texas 75019 Re: DeForest Rd. Lift Station Improvements Force Main Line D Change Order No. 4 Dear Mr. Griffin: Pursuant to a request of Rick O'Dell we have prepared the tbllowing information for your review regarding the use of 30" epoxy lined ductile iron pipe by open cut in lieu of 30" HDPE by direction drilling across the nursery property between Sta. 4+39 +/- and Sta. 6+93 +/-. We propose to furnish and install 30" epoxy lined ductile iron pipe by open in lieu of 30" HDPE by directional drilling for the following unit price: ADD 30" DIP By Open Cut 254 LF 214.00 54,356.00 Thrust Restraint Blocks 2 EA 8,748.00 17,496.00 DELETE 30" HDPE By Directional Drilling 254 (The 30" HDPE can not be returned for credit) LF 170.50 (43,307.00) Net lncrease In Contract Amount 28,545.00 Respectfully submitted, Mastec Nortl~ Amerj&a ~ ,. / __ I // David Holland Senior Vice President