SS9901-LR041207Client:
Project:
GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON AUSTIN LONGVIEW
11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080
Concrete Compression Test Report
City of Coppell Report Distribution: (1) City of Coppell
DeForest Rd. Lift Station Imp.
Force Main Line "D"
TMI Report No.: 74792-008
Report Date: 12/07/2004
Specification~s
Strength 4200 psi @ 28 Days Placement Date
Slump 3 in min 5 in max Sampled By
Air Content 3 % min 6 % max Weather
Concrete Temperature n/a Supplier/Mix
Ambient Temperature n/a Air Content Method
'[gst Data
11/01/2004
Mohammed A. Kashem
Cloudy
Custom Crete/CC1065A
ASTM C-231-B
Ticket Number: 314941 Time Batched: 12:50 pm Time Sampled: 1:15 pm
Slump: 4 in Air Content: 3.8 % Unit Weight: n/a
Concrete Temperature: 74° F Ambient Temperature: 72° F Yardage (c.y.): n/a
Placement Location: Manhole base 30" force main
Sample Location:
At Staiton 27+00
Age Max Load Area Streng~ Fracture
Set# Cyl~der Test Date (days) (lbs. ~rce) (sq.in.) (ps~ Type
1 11010401 11/08/2004 7 94180 28.27 3330 unbonded cap
1 11010402 11/29/2004 28 144400 28.27 5110 unbonded cap
1 11010403 11/29/2004 28 144640 28.27 5120 unbonded cap
1 11010404 Hold
28 day average 5120
Normal cylinder size: 6" x 12"
Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231.
TERRA-MAR, INC.
The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of
this report, or any part therein, is strictly prohibited without the express written consent of TMI.
0[ssD Page Iofl
Client:
Project:
GEOTECHNICAL, ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORTWORTH HOUSTON AUSTIN LONGVIEW
11050 Ables Ln., Dallas, Texas 75229 phone: (972) 488-8800 fax:(972) 488-8080
Concrete Compression Test Report
City of Coppell Report Distribution: (1) City of Coppell
DeForest Rd. Lift Station Imp,
Force Main Line "D"
TMI Report No.: 74792-008
Report Date: 12/07/2004
Strength 4200 psi @ 28 Days
Slump 3 in min 5 in max
Air Content 3 % min 6 % max
Concrete Temperature n/a
Ambient Temperature n/a
.SPecifi. cations .......... Test Data
Placement Date
Sampled By
Weather
SuppliedMix
Air Content Method
11/01/2004
Mohammed A. Kashem
Cloudy
Custom Crete/CC1065A
ASTM C-231-B
Ticket Number: 314941 Time Batched: 12:50 pm Time Sampled: 1:15 pm
Slump: 4 in Air Content: 3.8 % Unit Weight: n/a
Concrete Temperature: 74" F Ambient Temperature: 72° F Yardage (c.y.): n/a
Placement Location: Manhole base 30" force main
Sample Location:
At Staiton 27+00
Age Max Load Area Strength Fracture
Set# Cyl~der TestDate (days) Obs. ~rce) (sq.in.) (ps~ Type
1 11010401 11/08/2004 7 94180 28.27 3330 unbonded cap
1 11010402 11/29/2004 28 144400 28.27 5110 unbonded cap
1 11010403 11/29/2004 28 144640 28.27 5120 unbonded cap
1 11010404 Hold
28 day average 5120
Normal cylinder size: 6" x 12"
Field and laboratory tests by TMI are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231.
TERRA-MAR, INC.
The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of
this report, or any pad therein, is strictly prohibited without the express written consent of TMI.
mssp Page Iofl