SS9901-CS050119Turner Collie (0'Braden Inc TRANSMITTAL From: Date: Job No.: Subject: See Distribution ~c,¢~ Erika K. Cooper, P.E. - TCB January 19, 2005 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04-44-017A Rev 1 (Raven Coating) Submittal No. 04-44-024A (DeForest Lighting) Submittal No. 04-44-025A (Sandy Lake Lighting) Submittal No. 04-44-029A (Electrical Submittal) Submittal No. 04-44-030A (Gate Valve) Submittal No. 04-44-032A (Air Valve) Submittal No. 04-44-033A (Check Valve) TCB has the following comments on these submittals: Description Status Comment Raven Coating No Exception Taken DeForest Lighting No Exception Taken Sandy Lake Lighting Make Corrections Noted · Verify quantities Electrical Submittal No Exception Taken Gate Valve Make Corrections Noted · Provide three (3) 12-inch gate valves per Plans. Verify all quantities. · Provide spur gearing for valves 24" and larger per Specification Section 15107. · If gearing is required for 20" valves, provide spur gearing. Air Valve Make Corrections Noted · Provide air valves with reinforced nylon bodies. Check Valve No Exception Taken When you re-submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can-Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other