Loading...
SS9901-CS050103TurnerCollie Braden Inc. TRANSMITTAL To: From: Date: Job No.: Subject: See Distribution Erika K. Cooper,"P.E. - TCB January 3, 2005 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04-44-001A Rev 1 (Pump Clarification) Submittal No. 04-44-0017A (Raven Coating) Submittal No. 04-44-0018A (Parshall Flume) Submittal No. 04-44-0019A (Access Hatches and Neenah) TCB has the following comments on these submittals: Description Status Comment Pump Clarification No Exception Taken Raven Coating Make Corrections Noted · Note that thicknesses shown in "Coating Procedures for Raven 405" are average thicknesses · Perform any necessary repairs prior to coating application in accordance with Specification Section 09902 Parshall Flume Submit Specified Items · Submit flow data for 18" Parshall Flume (data provided is for 18" Palmer- Bowlus Flume) · Provide precast concrete manhole grade rings and manhole frame and cover (H- 20 rated) per precast manhole detail (Sheet SD-21) in City of Coppell Standard Construction Details Access Hatches and Rejected · Hatch must be Bilco Type K Single Neenah Leaf per Detail 4 on Sheet SS-1 · Verify openings for Neenah covers in field When you re-submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can-Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other