MCI-CS050111COl'FELL Janoary 1 I, 2005 Jason CalT M.C.I. Network Construction Services 244'7 Gateway Drive Irving TX 75063 RE: RO\V Use Permit for Crestside Facilities Subloop Dear Mr. (?an': The City of Coppell has received and reviewed the plans submitted for an installation at the above referenced location and we have the following comments to offer: 1. The permit application does not include contractor inf'o~Tnation. The City will require the contractor name, contact person, and 24-hr. emergency contact number prior to issuance of the permit. 2. Contractor shall pay special attention to pages 3 /,2 4 of the permit application. The City of Coppei1 will require conlbm~ance to all items listed on page 3. Page 4 is to be completed by City Streets and Utilities divisions personnel and returned to this office prior to release of any additional pemaits to MCI or the contractor mvolvcd. 3. Maintain a minimum 5' horizontal clearance from Cit? water, sewer or storm drain facilities. 4. Maintain a minimum 2' vellical clearance, preferably under our waterlines as opposed to above. 5. City of Coppell requires full depth saw cuts of concrete and silicone sealant for all concrete seams. 6. Lane closures may only take place between the hours erg:00 a.m. and 3:30 p.m. 7. Construction Drawings shall reference City of Coppell specifications and requirements. References to other cities' specifications shall be removed from the set. See mark-ups throughout the drawings for additional comment This pemdt can be approved xvith these referenced ~equircments as condilions, however the permit cannot be released until conh-actor inlbnnation is provided, Prior to beginning work please contact the City inspector and the Utilities dixision; a pre-construction conference shall be scheduled at our office. Included with this l;ax arc pages 3 and 4 of the permit as referenced in comment 2. If you have any questions, please contact me. Sincerely, Charlene i a Mattma, E I T Graduate Engineer Office: 972-304-3681 Fax: 972-304-3570 Page 3 of 4 COPPELL UTILITY RELOCATION CHECKLIST FOR WORK WITHIN CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS Listed below are minimum requirements for utility relocation projects: 1 A copy of the valid approved CityofCoppelI permit is required on thc project at ail times. 2. Nolle, adjacent property owners (commercial & residential) of project timeline; provide them with contact names and phone numbers. 3. Proper erosion control measures must be taken. 4. Follow Texas MUTCD standards for work in traffic zones. 5. Sod is to be replaced when necessary. [n'igation repairs must be performed in a timely manner. 7. Follow OSHA recommended trench safety at all times. 8. Repair existing utilities that are damaged, including but not limited to clean-outs, water valves, and SS manholes. 9 Densities may bc required in trench lines (ASTM). ] 0 Care and repair of street signage is the responsibility of the contractor. 11. No work is to be done in collector roadways bcfore 9:00 a.m. or aftcr 3:00 p.m. 12 Prior notice of work activity on weekends and holidays must be in writing. I3. Line locates must be performed in advance by contacting - CITY OF COPPELL UTILITIES DIVISION ci.coppell.tx.us 972/462-5155 CITY OF COPPELL ENGINEERING DEPT. 972/ 304-3679 HOMEOWNER ASSOCIATIONS 972/304-3669 (City Secretary Office) COMCAST CABLE 817/557-8296 x22 (Phillip Gwin) AT&T LOCAL NETWORK 214/ 215-0880 (Bren[ Vandiver) COSERV Gas & Electric 940/321-7844 (Roy Busby) EXPLORER PIPELINE 918/493-5100 (Patrick Nwakoby) TXU Electric Delivery Cmnpany 972/323-8719 (Larry Redick) VERIZON COMMUNICATIONS 972/318-5276 (Robert Martinez) FEDERAL EMERGENCY MGMT. ADMIN. 940/898-5138 TEXAS COMM. on ENVIRONMENTAL QUALITY 817/588-5800 DENTON CO. LEVEE DISTRICT 214/352-5118 (Richard ltightower) Atmos Energy (formerly TXU Gas) 817/ 355-7017 (Doug Brewer) 1 800 DIG TESS for line locates (344 - 8377) 14. Contaminants must be removed from work area daily and disposed of properly outside the City. I5. Streets, sidewalks and alleys must be kept dean of construction material and debris. 16. "Clean-up" requires returning work area to pre-project condition or better. 17. Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4) COPPELL UTILITY RELOCATION 1N RIGltT-OF-WAY OR EASEMENT Page 4 of 4 COMPLETION VERIFICATION NOTICE Contact CiD' of Coppell Public Works Division at 972-462-5155 to schedule an inspection with Utility & Streets personnel to verify that your project has been completed to City of Coppeli specifications. Failure to schedule verification inspection may delay future projects. Franchise Utility Name Project Location / Applicant's Work Order # (if applicable) Sub-contractor Company Name 24 hr. Contact Number Date of Verification Appointment Time of Verification Appointment INFOR?4ATION BELOW TO BE COMPLETED BY CITY OF COPPELL PERSONNEL · :° Inspected by of Utilities 31aintenance Division on and found to be acceptable / not acceptable because Follow-up needed? NO / YES Follow-up scheduled for · :° Inspected by of Streets :~laintenance Division on and found to be acceptable / not acceptable because Follow-up needed? NO / YES Follow-up scheduled for A copy of this completed notice is to be provided to: CiD, of Coppell Engineering Dept. 255 Parkway Blvd., Coppell TX 75019 Office: 972-304-3679 Fax: 972-304-3570