ST9302-CS000214COPPELL, TEXAS 75019 DATE Robert Weber, Project Engineer Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Re: Sandy Lake Road Project # ST 93-02 Proposed Change Order for the extension of Sandy Lake Road (Ma( CDS - , DKi Dear Mr. Weber: I have received your preliminary costing for the extension of Sandy Blvd. to Kimbel Court. I was somewhat surprised by the overall total and in particular the total for mobilization, right-of-way preparation, field office, traffic signal installation, temporary roadway, storm water prevention plan and pavement markings. I also have questions that need to be resolved concerning why quantities were changed for unclassified street excavation, lime subgrade, hydrated lime, 8" concrete paving, 6" concrete curb and 4" top soil. There were other minor quantity changes throughout the estimate, however, the above referenced ones are the ones that concern me most. During the pre-bid meeting of July 21, 1998, the extension of Sandy Lake Road was discussed at length and it was noted that this would potentially be assigned as a change order to the low bidder on the project. The key item was that it was our intent to assign it as a change order not as extra work for which new prices would be calculated. If the cost of the extension was greater than 25 % of the total project, then there could be some validity to it not being classified as a change order. However, the cost of the extension is not 25 % of the project. The following represents my concern with the costing for the pay items previously mentioned: Mobilization - The specifications for Sandy Lake Road state that mobilization is not to exceed 5 % of the total value of the work minus the cost for mobilization. Using the numbers that you submitted i.e., not adjusting the areas where I think that they are out of line, the maximum mount of the mobilization on this change 'order would be $51,758. However, even that number should be adjusted downward based on adjustments in the other bid items on the proposed change order. On your original bid you estimated about $41/pe, r foot for mobilization. Using that number for the 766 feet of the change order would equal Robert Weber, Project Engineer Ed Bell Construction 10605 Harry Hines Blvd. P.O. Box 540787 Dallas, TX 75354-0787 Coppell, Texas 75019 972-462-0022 February 14, 2000 Re: Sandy Lake Road Project # ST 93-02 Proposed Change Order for the extension of Sandy Lake Road (MacArthur Blvd. to Kimbel Ct.) Dear Mr. Weber: I have received your preliminary costing for the extension of Sandy Lake Road from MacArthur Blvd. to Kimbel Court. I was somewhat surprised by the overall total and in particular the total for mobilization, right-of-way preparation, field office, traffic signal installation, temporary roadway, storm water prevention plan and pavement markings. I also have questions that need to be resolved concerning why quantities were changed for unclassified street excavation, lime subgrade, hydrated lime, 8" concrete paving, 6" concrete curb and 4" top soil. There were other minor quantity changes throughout the estimate, however, the above referenced ones are the ones that concern me most. During the pre-bid meeting of July 21, 1998, the extension of Sandy Lake Road was discussed at length and it was noted that this would potentially be assigned as a change order to the low bidder on the project. The key item was that it was our intent to assign it as a change order not as extra work for which new prices would be calculated. If the cost of the extension was greater than 25 % of the total project, then there could be some validity to it not being classified as a change order. However, the cost of the extension is not 25 % of the project. The following represents my concern with the costing for the pay items previously mentioned: Mobilization - The specifications for Sandy Lake Road state that mobilization is not to exceed 5 % of the total value of the work minus the cost for mobilization. Using the numbers that you submitted i.e., not adjusting the areas where I think that they are out of line, the maximum amount of the mobilization on this change 'order would be $51,758. However, even that number should be adjusted downward based on adjustments in the other bid items on the proposed change order. On your original bid you estimated about $41/pe.r foot for mobilization. Using that number for the 766 feet of the change order would equal approximately $31,000. So therefore, a request for mobilization of $285,000 does not seem to be inline with this change order. Right-of-way preparation - You originally bid $125,000 for 9,828 feet, which is slightly over $12/per foot. If you utilize that cost per foot on this change order we should have a right-of- way preparation cost of approximately $9,363 not $60,000 as submitted. Field office - This was originally bid at $20,000 for 850 calendar days or approximately $23.53 per/day of the project. Your letter requests an extension of 120 days for this work. Therefore, I would anticipate that the field office cost would be in the range of $2,824, not $24,000 as submitted. It is also interesting to note that the $24,000 is $4,000 more than the original bid for the field office that was anticipated to be on the job site for 850 days. Traffic signal installation - There were three traffic signals proposed on the original Sandy Lake Road project (Samuel, Moore and Heartz). Those range in cost from $88,000 to $110,000, complete and in place. Even though the MacArthar intersection is somewhat wider which could entail some additional conduits, I did not anticipate a traffic signal installation cost double the highest traffic signal cost originally bid on the project. The request for $220,000 for the traffic signal at MacArthur appears to be out of line for this change order. Temporary roadway - The original bid included temporary roadway for approximately $75,000 for a distance of 9,828 feet. That was bid as a lump sum item. That would be approximately $7.63 per/foot of the roadway. Temporary roadway for an extension of 766 feet should be more in the range of $5,850, as opposed to your $50,000 request. Also, the $50,000 request is 2/3's of the cost for the entire original bid on temporary roadway. Storm water pollution plan - The original bid for the storm water pollution plan was $40,000 for a project of 9,828 linear feet or approximately $4.07/per foot. I would anticipate a storm water pollution plan cost of approximately $3,120 for this change order, not the $20,000 as proposed. Pavement markings - On the original bid pavement markings were $60,000 for 9,828 linear feet of roadway or approximately $6.11/per linear foot. I would anticipate a change order for the 776 feet in the range of $4,685, not $22,000 as submitted on the change order. Some other items to note for clarification on the change order: Lime subgrade should be 8-inch lime subgrade in accordance with the Sandy Lake Road plans, not 6 inches as shown on the description of the pay items. It appears that Pay Item t/18 2" Type D Hot Mix is not needed for this project. The plans were designed by a different consultant and it appears they anticipated an 8-inch transitional paving, not the 6-inch as proposed in the original Sandy Lake plans. In our Sandy Lake Road plans we provide for 6-inch hot mix transition paving as 4 inches of Type B and 2 inches of Type D. There were various new items on the proposed change order which were not covered by the Sandy Lake Road original bid. In my review of the pay items it appears that the following are new items: removing the guardrail, removing concrete flumes, removing bricks/stonewall, removing electrical box, 6" Type D hot mix curb, concrete header, metal beam guardrail, laydown terminal, 10" PVC sewer, 21" PVC sewer, adjusting existing sanitary sewer manholes, adjusting existing water meter valve boxes and the 2" PVC conduit. My initial review of the extension of Sandy Lake Road based on the 95 % complete plans of which we provided you and the way that Sandy Lake Road was originally bid indicate that this change order should be in the range of $800,000 not $1.3 million as submitted. We are approximately $500,000 apart on what in my opinion should be the value for the change order. If this change order cannot be reevaluated and brought more inline with the original Sandy Lake Road bid items on value, then it appears the only option left to the City would be to generate a completely separate set of plans to put out to bid. That means two contractors, unless your firm is the low bidder, would be working along the Sandy Lake Road corridor during the same timeframe. As soon as possible we need to sit down and discuss this proposed change order so that the City can make a determination on which direction to proceed. Thank you for your consideration of this matter and I will walt to hear from you. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering/Public Works cc: Garreth Campbell, Inspector file/ST93-O2Foell/0214001~x FAX (214) 352-3201 TELEPHONE (214) 358-6581 ED BELL CONSTRUCTION COMPANY POST OFFICE BOX 540787 10605 HARRY HINES DALLAS, TEXAS 75354-0787 DALLAS, TEXAS 75220 February 10, 2000 Mr. Kenneth M. Griffin, P.E. Director of Engineering and Public Works City of Coppell 255 Parkway Blvd. Coppell, Texas 75019-4409 Rc: Sandy Lake Road Reconstruction Coppell Project #: ST 93-02 Kimley-Horn Project #: 06940600 DWU Project #: 98-311F Dear Mr. Griffin: We have reviewed the October 29, 1999 plans for the MacArthur Boulevard and Sandy Lake Road intersection improvements. Our prices for the work identified in that set of plans are enclosed for your review and apprOVaL We have nOt quoted the four Street light poles because the light poles on the remainder of the project will be done by others; however, we have quoted the conduit for the street lights. Because of the phased nature of the intersection, coordination of the conduit installation in the intersection will be more efficient utilizing an EBCC subcontractor rather than bY waiting for a TXU subcontractor. We envision constructing this intersection by installing all of the utilities and then constructing the intersection in quadrants. This work will be completed utilizing four to six traffic switches at Z/ the intersection that will require temporary signal work at the intersection and detour work east of MacArthur. We will need an additional 120 calendar days to complete this work. If you have any questions' regarding this information, don't hesitate to contact our office. ~d~,?erely, ~f~ l~~.~e Co struc Company Robert B. Weber Project Engineer XC: Michael G. DeMotte, Kimley-Hom and Associates, Inc., 801 Cherry Street, Suite 1100 Fort Worth, Texas 76102-6803 AN EQUAL OPPORTUNITY EMPLOYER Sent By: EBCC; ~ 2143523201; Feb-~%00 3:16PU; Page 3/3 MACA~Iql~IUII BOi~I. EVAItl) INT~R,f,E~I'IOll IlllPRO~T~ladT6 0oo0 -- ,d.*2b 0 OZOO - I ~o0 .- ~ ~'.~_~ ,~'352L s~O: ~o0 ~0 ~o0 %000 MACARTHUR BOULEVARD INTERSECTION IMPROVEMENTS ITEM DESCRIPTION UNIT QUANTITY PRICE EXTENSION 1 Mobilization LS 1.00 $285,000.00 $285,000.00 2 ROW Preparation LS 1.00 $60,000.00 $60,000.00 3 Field Office LS 1.00 $24,000.00 $24,000.00 4 Rem Concrete and HMAC SY 6,207.00 $4.00 $24,828.00 5 Rem Concrete Curb LF 1,267.00 $2.50 $3,167.50 6 Rem Headwall EA 4.00 $500.00 $2,000.00 7 Rem Existing RCP LF 426.00 $10.00 $4,260.00 8 Rem Guardrail LF 90.00 $10.00 $900.00 9 Rem Concrete Flumes LF 69.00 $50.00 $3,450.00 10 Rem Brick/Stone Wall LF 530.00 $10.00 $5,300.00 11 i Rem Electrical Box EA 2.00 $200.00 $400.00 12 Rem Grate Inlet EA 1.00 $500.00 $500.00 13 Unclassified Street Excavation CY 7,513.00 $3.00 $22,539.00 14 6" Limed Subgrade SY 9,502.00 $1.35 $12,827.70 15 Hydrated Lime TN 185.00 $85.00 $15,725.00 16 8" Concrete Pavement SY 6,449.00 $24.88 $160,451.12 17 6" Concrete Curb LF 3,202.00 $1.50 $4,803.00 18 2" TY D HMAC Transition SY 898.00 $15.00 $13,470.00 19 6" TY A HMAC Transition SY 931.00 $30.00 $27,930.00 20 6" TY D HMAC Curb LF 259.00 $15.00 $3,885.00 21 4" Concrete Sidewalk SY 298.00 $20.00 $5,960.00 22 Concrete Pavers SY 2,165.00 $58.00 $125,570.00 23 Concrete Driveways SY 356.00 $30.00 $10,680.00 24 HMAC Driveways SY 158.00 $50.00 $7,900.00 25 Concrete Header LF 100.00 $15.00 $1,500.00 26 Metal Beam Guardrail LF 75.00 $20.00 $1,500.00 27 Laydown Terminal EA 1.00 $1,100.00 $1,100.00 28 18" CL III RCP LF 436.00 $32.00 $13,952.00 29 21" CL Ill RCP LF 129.00 $35.00 $4,515.00 30 24" CL III RCP LF 232.00 $41.00 $9,512.00 31 27" CL III RCP LF 138.00 $46.00 $6,348.00 32 33" CL III RCP LF 122.00 $60.00 $7,320.00 33 10" PVC Sewer LF 20.00 $48.00 $950.00 34 21" PVC Sewer LF 548.00 $140.00 $76,720.00 35 Recessed 6' Curb Inlet EA 2.00 $1,700.00 $3,400.00 36 Recessed 8' Curb Inlet EA 2.00 $2,000.00 $4,000.00 37 Recessed 10' Curb Inlet EA 1.00 $2,100.00 $2,100.00 38 Recessed 14' Curb Inlet EA 1.00 $3,000.00 $3,000.00 39 Standard 10" Curb Inlet EA 2.00 $2,100.00 $4,200.00 40 Standard Y Inlet (3 sides) EA 2.00 $2,200.00 $4,400.00 41 Standard 6' TY A Storm Drain Manhole EA 2.00 $2,000.00 $4,000.00 42 Standard Manhole Extra Depth (>6') EA 5.00 $150.001 $750.00 43 Standard Sanitary Sewer Manhole (6') EA 4.00 $1,500.00 $6,000.001 44 Sanitary Manhole Extra Depth (>6') EA 10.00 $150.00 $1,500.00 45 24" TY C Headwall EA 1.00 $2,000.00 $2,000.00 46 33" TY C Headwall EA 1.00 $2,500.00 $2,500.00 47 Adjust Existing Sanitary Sewer Manhole EA 4.00 $850.00 $3,400.00 48 Adjust Exiisting Water Meter Valve Boxes EA 10.00 $120.00 $1,200.00 49 Traffic Signal Installation - MacArthur Blvd. LS 1.00 $220,000.00 $220,000.00 50 2" PVC Conduit (Direct Buried) LF 850.00 $3.50 $2,975.00 51 30'-0" Sq Painted Pole w/2-250 W HPS Fixtures & Foundation EA 4.00 NO BID NO BID 52 Temporary Roadway LS 1.00 $50,000.00 $50,000.00 53 4" Topsoil SY 3,669.00 $2.50 $9,172.50 54 Hydromulch SY 3,669.00 $1.25 $4,586.25 55 Storm Water Prevention Plan (SWPPP) LS 1.00 $20,000.00 $20,000.00 Pavement Markings LS 1.00 $22,000.00 $22,000.00 TOTAL $1,320,157.07 o~/C--.I.. ~1~ 6S~ 6S17 ~-O~ O~-* 16~ Da3 ],~ Co. Bod~t O~c~ 21~ 6.53 6517 P.01 DALLAS COUNTY PUBLIC WORKS FAC V TO: OF: PHONE: SEIki' BY: FAX #: John I,,. M _e~s_. P.E.. _Pro_i_ect Engineer ¢214) 653-6416 TOTAL NUMBER OF PAGES INCLUDING COVBR SHEET IS COMMENTS: 411 Elm Street *If you do not LCCe__.ive all of the pages, plea~ call the number below. .- Dallas, Texas 75202 653-7151 214 653 6517 Au~1-04-'98 03: 16P Da] ]ir Co. Budget Off~ce 214~ S53-6517 UNIT PRICE BID SCHEDULE SANDY LAKE ROAD PAVING, DRAINAGE AND WATER SYSTEM IMPROVEMENTS BASE BID PART ! - CITY OF COPPELL PAVING AND DRAINAGE item Quantity Unit Description and Price in Words 1. I I,S Mobilization Dollars and __ Cents Per Lump Sum Unit Price 2. ! LS Right-of-Way Preparation Dollars and __Cenls Per I..ump Sum 3. I I.S Field Office and Dollnrs Cents Per Lump Sum 4. 6,207 SY Remove Old Concrete mid IIMAC (Walks, Drives, Stre~s) Dollars and __ Cents Per Square Yard 5. 1,267 LF Remove Old (Concrete) Curb Dollars and ._Cents Per Linear Foot 6. 4 EA Remove Existing lleadwali Dollars and __ Cents Per Each 5oo 7. 426 LF Rcmove Existing Storm Drain Pipe (All Sizes) Dollars and __Cents Per Linear Foot 8. 90 LF Kemovc Existing Guardrail Dollars and Ccnls Per L,incar Foot Tolnl Price 4-'2.bO - 5o0 ~1~ 65J 6517 Aug-O4~8 O3:l~P Dalir ~ Co. Budget O~f'~ce 21253-6517 P.03 PART I - CITY OF COPPELL PAVING AND DRAINAGE (.Continued) ittm No. Quantity Unit 60 LI: D~eription and Price in Words Remove Exis~g Concrete Flumes Dollar~ and Cents Per Linear Foot $0. 510 LF Remove Existing Brick/Stone Wall Dollars and Cents Per Linear Foot I 1. 2 £A Remove Existing Electrical Box Dollars and Cents Per -Each 12. i EA Remove Existing Gratc Inlet Dollars and Cents Pcr Each 13. 9,730 CY 14. 8,568 SY 15. 167 TONS 16. 8,165 SY Unclassified Street Excavation Dollars and Cents Per Cubic Yard eni//me Treated Subgradc sity Control) Dollars and Cents Per Square Yard (Note: See alternate bid item # 14A. Tolal nubgradc is 8,56R S¥. Thc tt~e of Lime or cement will be determined by the City's repreSeflta/iv¢ duri~tp. Con$lructlott.) Hydrated Lime (_a~ 39 lbs./SY Dollars and Cents Per Ton (Note: se~ altcmale bid item # I Total ~ubiFad~ is 8,568 SY. The u~ or' Lime or cement will be d~termincd by thc City's ~prc.ncntativ¢ during ~unstn:ction.) 8" Concrete Pnvement Dollars and Cents Per Square Yard Unit Price IO Total Pri~e 1%230 ~ 14-'5 214 653 6517 Au~-04-'98 03: 16P DallJ, ! Co. Budget Office 214~c153-6517 P. 04 PART I - CITY OF COPPELL PAVING AND DRAINAGE (Continued) item No. 17. Quantity Unit 3.168 LF Description and Price in Words 6" Concrete Curb Dollars and Cents Per Linear Foot IR. 898 SY 19. 931 SY 2" Type D HMAC Transition Pavement Dollars and Cents Per Square Yard 6" Type A HMAC Transition Pavement Dollars and Cents Per Square Yard 20- 259 LF 6" Type D IIMAC Curb Dollars and Ccnts Per Linenr Foot 21. 299 SY 4" Concrete Sidewalk Dollars and Cents Per Square Yard 22. 1,207, SY Solid Concrete Paving Stones Dollars and Cents Per Square Yard 23. 347, SY Concrete Driveway Dollars and CcnLs Per Square Yard 24. 158 SY HMAC Driveway Dollars and Cents Per Square Yard 25. 28 LF Reinibrced Concrete Header Dollars ~nd __ Cents Per Linear Foot Unit Price Total Price -- ??7 - '30 -- Lcd. Icp ~1~ 653 6519 Aug-O4~-giB O~: lYP Da] ir ] Co. Budget Off~cm 21,~-653-6517 P.OB PART I - CITY OF COPPELL PAVING AND DRAINAGE (.Continued) item No. 26. Quantity 435 Description and Price in Words I 8" Cia.ss 111 ReinR)rced Concrcte or High Density Poiyethylcmer~tIl~r~ Pipe Dollars and Cenls Per l.incar Foot 27. 126 LF 21" Class i I I Reinforced Concrete or Dollars and Cents Pcr Linear Foot 28. 228 LF 24" Class III Reinforced Concrete or .Dollars and CenL~ Per Linear Foot 29. 138 I.F 27" Class III Reinforced Concrete or Dollars and Cents Per Linear Foot 30. 115 LF 33" Class III Rcinforced Concrete or Dollars and Cents Pcr Linear Foot 31. 360 I.F 2 I" PVC Sewer Pipe Dollars and Cents Per Linear Foot 32. 2 EA Reces~d 6' Curb Inlet Dollars and Ccnts Per Each 33, 2 EA Recessed 8' Curb Inlet Dollars and Ccnts Per Each Unit Price 60'- Total Price ioCioo I - ~? Rl~ 65J 6517 Au~-O4-g8 03:iTP Oa]] - Co. Budget Off~c~ 214-~53-6517 P. 06 PART I - CITY OF COPPEL,L PAVING AND DRAINAGE (Continued) Item Quantity Unit 34. I EA Recessed I0' Curb Inlct Description and Price in Words and Cents Pcr Each 35, I EA Recessed 14' Curb lnlct Dollars and Cents Per Each 36. 2 EA Standard 10' Curb Inlet Dollars and __Cents Per Fach 37. 2 EA Standard "Y" Inlet Dollars and __Cents Per Each 38. 2 F.A Standard Type A Storm Drain Manhole (6') Dollars and Cents Per Each 39. 4.9 EA Standard Manhole Extra Depth (>6') Dollars and ._Cents Per Linear Four 40. I EA Standard (6') and Sanitary Sewer Manhole Dollars Cents Per Each Unit Price 5007 Total Price \ 000 '- 4200 41. 13.5 LF 42. 1 EA Sanitary Manhole Extra Depth (>6') Dollars and Cents Per I.incar Foot 3'-0" High Type CI l-1 l-B Headwall Dollars and Cents Per Each '7 Aug-O4--g8 03: 17P Da3 ~ Co. Budget Off,ce 21~ -653-6517 P.07 PAinT 1 - CITY OF COPPEI,L PAVING AND DRAINAGE (Continued) Item No. 43. Quantity Unit I Descriplion and Price in Words 4'-0" High Type CH-I l-B Headwall Dollars and Cents Per Each 44. 4 EA Adjust Existing Sanitary Sewer M H to Grade Dollar~ and Cents Per Each 45, I 0 EA 46. I LS 47. 850 l.F Adjust Existing Water and Meter Valve Boxes to Grade F~)llars and Cents Per Each Traffic Signal Installation - MacAr~hur Blvd. Dollars Unit Price 48. 4 FA 49. I LS 50. 315 SY and __C~qts .er s 't. ) I OOt I-1/4" PVC Conduit (Direct Buried) Doll.s Cents Per Linear Foot 30'-0" Sq. Painted Pole w/2 - 250W HPS Fixtures & Foundation Dollars and Ce.tn Per F, ach 51. 3563 SY Temporary Roadway ..Doltars and __ Cents Per Lump Sum Dollars Cents Per Square Yard 4" Topsoil and Hydromulch Dollarn Cents Per Square Yard and Total Price %4oo 77-- a? ~1~ 655 6519 Cc) Aug'-04-~8 03:17P Ball _ . Budget Office 214-=53-6517 P. 08 PART 1 - CITY OF COPPKLL PAVING AND DRAINAGE (Continued) Item NO. 52. Quantity Unit I LS l)escripUon and PFice in Words Stormwatcr Pollution Prevention Plan (SWPPP) Dollars and .__Cents Per Lump Sum Unit Price Total Price SUBTOTAL PART I - CITY OF COPPELL PAVING AND DRAINAGE (Bid Items I thru 52) $ STORM DRAIN PIPE MATERIAL TO BE INSTALLED WHERE OPTION IS GIVI~,,N (RCP OR I(DPE):. Aug-04i98 03: 1BP Da]-I. Co. Budget Of:~ce 214 6~53-6517 PART IA - CITY OF COPPELL PAVING AND DRAINAGE ALTERNATE BID ITEMS No. Item 14A. Quantity Unit g,568 sY Description and Price in Words 8" Cement Treated Subgrade (Density Control) Dollars and __Cents Per Square Yard (Note: Total Subgtad¢ ts 8,568 S¥. The usc of lime or Ix:meat will be determined by thc City'.~ neptc$cntatlve daring con.~tmction) 15A. 167 TONS Cement Treated Base (a~ 32 lbs,/$Y Dollars and Cents Per Ton (Note: Total Subg~dc i.~ #,$68 SY. The u~C of lime or cement will Ix: detemlincd by the CiW's mp~scntativc during construction.) Unit Price Total Price SUBTOTAL PART lA - CITY OF COPPELL PAVING AND DRAINAGE ALTERNATE BID ITEMS (Bid Items 14A and 1SA) $