Freeport NIP(8.0)-LR050202Client:
Project:
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Duke Realty Services, LP
Mr. Brian SWaley
5495 Belt Line Rd., Ste 360
Dallas TX 75254 ~
Coppell, Texas ~'
Report No.: 227102
Project No.: 049245
Date of Service: 01/29/2005
Report Date: 02/02/2005
Reinforcing Steel Inspection
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) arrived on site as
scheduled to perform a Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 2
Technician: Jeremy Watts
Report Distribution:
(1) Duke Realty Services, LP
(t) Extranet
(1) City of Coppell
(1) City of Coppall
5:30am - 8:00am
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented hereto were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject mat~er provided by persons or conditions over which we have no control. Our letters and
reports are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wri~cn approval of Rone Engineers, Ltd.
ineers
Client: Duke Realty Services, LP
Project: Freeport XI and XII
Locations and Items Inspected:
Report of
Reinforcing Steel Inspection
Report No.:
Project No.:
Date of Service:
Page
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214} 630-9745
227102
049245
1/29/2005
2 of 2
Pavinl~ entrywa7, 10' north X 45' east from northeast comer
of Buildin[[ #11.
Discrepancies / Comments:
l. Mud needs to be removed from rebar and forms.
*Mud was cleared from forms and rebar as corrective action.
Inspector's Signature:
Client/Contractor Signature: Client/Contractor Copied with Results: Yes