Loading...
Park West CC(1)-CS040825Ke~ ~iffi~: S~uil~stern BIvS. Page 1 From: Ken Griffin ('1~, To: David Francis ..~)~ ~, Date: 8/25/2004 5:13:28 PM Subject: Southwestern Blvd. David I have reviewed other streets in the area, including the existing Southwestern Blvd., and it's my opinion that the street should be 45' bc-bc, not the 41' as shown. Also, on our main streets, especially in the industrial areas, we use 8" thick subgrade and a lime rate of 40# plus. With the above changes, the section should be ok. Ken Griffin