BEI Properties-CS041028DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
iTEM:
BEI Properties Addition, Lot 1~ Block A, Minor Plat, to allow thc
construction of a 3,537-square- foot retail building on 0.48 of an acre of
property located along the west side of Denton Tap, betwecn Southwestcm
Boulevard and Bethcl Road, at the request of Gene Cooper, Cooper General
Contractors
STAFF REP.: Matt Steer PROJECT ID # MP-04-0075
9RCDATE: OCTOBER 28, 2004 & NOVEMBER 4, 2004
CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686
COMMENTSTATUS: ,/PRELIMINARY ~t~r~t ~'tc~n
~ ~"r~o P&Z
Utility Plan -
1. Connection to existing sewer on east side of Denton Tap shall be by dry bore.
2 Provide a clean-out at the property line for the sewer service.
3. Will there be an irrigation meter?
Provide preliminary grading and drainage plans for review. Storm drainage shall be picked
up onsite.
Plat -
1. Provide mutual access easement for site plan comments.
2. Define the easement shown on the plat.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
BEI Properties Additions Lot Is Block A, Site Plan, to allow the construction
of a 3,537-square- foot retail building on 0.48 of an acre of property located
along the west side of Denton Tap, between Southwestern Boulevard and
Bethel Road, at the request of Gene Cooper, Cooper General Contractors
STAFF REP.: Matt Steer PROJECT ID # SPA-04-0074
DRCDATE: OCTOBER 28, 2004 & NOVEMBER 4, 2004
CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Worlds 972/304-3686
Fi
COMMENT STA TUS: ,/PRELIMINARY
AFTER P&Z
1. Driveway radius should not cross property line without some sort of mutual access easement.
2. Move sidewalk to 4.5' offback of curb to line up with sidewalk to the north.
3. Why does the ingress/egress easement to the south not line up with your development?
4. Mutual Access Easement should be dedicated across your property from north to south.