Loading...
BEI Properties-CS041028DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS iTEM: BEI Properties Addition, Lot 1~ Block A, Minor Plat, to allow thc construction of a 3,537-square- foot retail building on 0.48 of an acre of property located along the west side of Denton Tap, betwecn Southwestcm Boulevard and Bethcl Road, at the request of Gene Cooper, Cooper General Contractors STAFF REP.: Matt Steer PROJECT ID # MP-04-0075 9RCDATE: OCTOBER 28, 2004 & NOVEMBER 4, 2004 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Works 972/304-3686 COMMENTSTATUS: ,/PRELIMINARY ~t~r~t ~'tc~n ~ ~"r~o P&Z Utility Plan - 1. Connection to existing sewer on east side of Denton Tap shall be by dry bore. 2 Provide a clean-out at the property line for the sewer service. 3. Will there be an irrigation meter? Provide preliminary grading and drainage plans for review. Storm drainage shall be picked up onsite. Plat - 1. Provide mutual access easement for site plan comments. 2. Define the easement shown on the plat. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: BEI Properties Additions Lot Is Block A, Site Plan, to allow the construction of a 3,537-square- foot retail building on 0.48 of an acre of property located along the west side of Denton Tap, between Southwestern Boulevard and Bethel Road, at the request of Gene Cooper, Cooper General Contractors STAFF REP.: Matt Steer PROJECT ID # SPA-04-0074 DRCDATE: OCTOBER 28, 2004 & NOVEMBER 4, 2004 CONTACT: Kenneth M. Griffin, P.E., Dir. of Engineering/Public Worlds 972/304-3686 Fi COMMENT STA TUS: ,/PRELIMINARY AFTER P&Z 1. Driveway radius should not cross property line without some sort of mutual access easement. 2. Move sidewalk to 4.5' offback of curb to line up with sidewalk to the north. 3. Why does the ingress/egress easement to the south not line up with your development? 4. Mutual Access Easement should be dedicated across your property from north to south.