Loading...
Sandy Lk Cross 2R-CS050214 (2)T H E C I T Y O F COFFELL ,lames Dewey. Jr.. P.E. ,IDJP, Engineers and Consultants. Inc. 2500 l'exas Drixe. guile Irving, TX RI: Sandy Lake Crossing, Lot 2[,?.. Block 1 Fee Assessmell! I.etter Dear Mr. De;',ey: Enclosed is a copy of the City of Coppell i)cx elopmcnt I'ec ,,\sscssmenr table, :dong whh a cop5 o1~ thc Dex eloprl2ent Fee calctdalions fbr the rcfcrcnccd developllqellt Please make payment ibr the hnpacl Fees Io tile City of Coppel] in the amount oi'%1(!:2','< 74 and lb~xs lo tho Engineering Department along with a cop) of die Fcc Assessment table. Ibis anlotmt iN a portion tlae assessed fbes that need lo be paid prior to llling of thc lhml plat Pt<:,sc note thai thc I'cxas Legislature, under Senate Bill 24~, dcla)ed the collection of Wmcr and Scxxc~ Impact t"ces until issuance of a Building Pen]nit. Please provide a copy of lJle ~ ll~iHCCl's cMlmatc et C{HII~L~CI to our paid prior to the sclncdulcd pre-consn uction n~ecting Thc additional fees for watCl' Zllld S~.'\VCI' tltIDS. V,:[lteI' meters, and utilit> inspcctit,n Ices need to bc paid ,10 S Coppcl/ Road Nlctc~s xxill bc t*~dc~cd separate check at the new Public Works Serxicc ('enter, N wlnen those fees are paid. Appropriate pa)a~cnt of the required fees x~ ill help inSLU'C a successful bc?nnin:.z of this pro] cci \\e look Sincerely, Chaxlcnc La MaYtina. E.[.T. Graduate Engineer CC: .lenniii~r Annstrong, Finance Director Mary Beth SpletzeI, AdministIativc Sccretaiy. Building Inspccti~ms Glenn Hollox~ell, Assistant Director of Public Works Greg Jones, (~hief Buihting Official Brad Reid. Director of Pinks and Recreation Project: [)ale: DEVELOPMENT FEE TABLE Sandy Lake Croxsing, Lot 2R, Block 1 2/10/2005 TOTAl. AMOUNT DUE FEES DUE PRIOR TO COUNCIL API'ROVAL Water Impact Fee (100% due at Issuance of Building Pcmfit) Water Tap hrspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) S 126.67 (100% due at Issuance of Water Meter) Water Metcr Fee (lrrigation/Fireline) S 1.')54.43 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.0() (100% due at Issuance of Water Meter) hzigatiorffFireline Metcr Deposit ( 100% due at Issuance of Water Meter) Wastewater hnpact Fcc (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $5(}.00 (100% due at Issuance of Building Permit) t ltility Final Inspection Fee $50.0~> (100% due at Issuance of' Building Permit} Park Fee (100% duc prior to Council Approval) Roadway Impact Fee $1 (I,278.74 $10.275.74 (I00% due prior to Council Approval) Street Light Fcc h~fk)rmation not Axailable (100% due prior to Acceptance of Prqject) Il Street Sign Fcc lnfbrmation not Ax ai!ablc ( 100% due prior to Acceptance o C Prqjcct ) It Construction Inspection Fee h~lk)rmation not Ax ;~i table (100% due prior to Start of Construction) TOTAL $17,599.S4 I'OTAL AMOUNT DUE PRIOR 'FO FILING FINAl. PLAT $1 O,278.74 DEVELOPMENT FEE WORKSHEET PROJECT: Sand), Lake Crossing, Lot 2R, Block 1 DATE: 2/10/2005 Water hnpact Fee: Domestic Meter(s): 1 - 1 1/2 inch = 5 irrigation Meter(s): 1 - 1 1/2 inch - 5 0 - 0 Fireline Meter(s): 1 - 6 inch = 2 5 Total#: 12.5 ESU's @ $280 00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total fl: 3 Connections @ $50.00 ea (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ 512667 (Single family due prior to issuance of building permit) (All other developments due prior to ~ssuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 irrigation Meter(s) @ $126.67 Total #: 0 Additional Irrigation Meter(s) @ $000 Total #: 1 Fireline Meter(s) @ $1,82776 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total fl: 1 Meter(s) @ $30 00 ea (100% due prior to ~ssuance of water meters) Irrigation/Fire Meter Deposit Fee: Total Cf: 2 Meter(s) @ $3000 ea (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 5 (Due prior to issuance of building permit) @ $28000 ea Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Totai #: 1 Lots @ $50.00 ea, (100% due prior to issuance of buirding permit) ESU's ESU's ESU's ESU's $3,500 00 $150 00 $120 67 $126 67 $0.00 $1,827.76 $3000 S6000 $1,400.O0 S50.00 $50 00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 Single-family @ $000 per lot Multi-family @ $000 per unit (100% paid prior to Council approval of final plat) $0 00 $0.00 $10,278 74 Information not Available Road~¥ay Impact Fee: (See attached fee calculations) Street l,ighting Fees: Assessed for lighting in the City's right-of-way This fee cannot be assessed until after T.U Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not Available Construction Inspection Fees: A copy of the development contract must be submitted for assessment The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Information not Available Page 2 ROADWAY IMPACT FEE CAI~CI;i~ATIONS PROJECT: DATE: Sandy Lake Crossing, Lot 2R, Block 1 2/10/2005 ROAD~VAY IMPACT FEE: [.and Usc ** ( 'onnnelcial OthcIs N~t Sj¢ccificd Building Area (si) 7.198 Development Units ** ~ 20 Vehicle Miles pei Dcvclopmcn! I Jnit ** 4 76 Fee per Vehicle Mile *** $~00 Roadway hnpact }"cc due (Dex elopnlcnt [ mis) x 'Vehicle Milcs per Dcx elopmenl [JlliI) x tFcc per ¥C}]lClC \Iilc) g i0.27S -4 ': !Figure 2 - Road,.xil.x hnpact l'ee Studyl '~:(Fable3 Roadx;Ix IinpaclleeStudy) *** (Sclncdule 2, Page 3 - Roadx~:~3 Impact Fcc Smdyl I , A,VIOI,)VTDUE: $I0,27874 I