Sandy Lk Cross 2R-CS050214 (2)T H E C I T Y O F
COFFELL
,lames Dewey. Jr.. P.E.
,IDJP, Engineers and Consultants. Inc.
2500 l'exas Drixe. guile
Irving, TX
RI: Sandy Lake Crossing, Lot 2[,?.. Block 1
Fee Assessmell! I.etter
Dear Mr. De;',ey:
Enclosed is a copy of the City of Coppell i)cx elopmcnt I'ec ,,\sscssmenr table, :dong whh a cop5 o1~ thc
Dex eloprl2ent Fee calctdalions fbr the rcfcrcnccd developllqellt
Please make payment ibr the hnpacl Fees Io tile City of Coppel] in the amount oi'%1(!:2','< 74 and lb~xs
lo tho Engineering Department along with a cop) of die Fcc Assessment table. Ibis anlotmt iN a portion
tlae assessed fbes that need lo be paid prior to llling of thc lhml plat Pt<:,sc note thai thc I'cxas
Legislature, under Senate Bill 24~, dcla)ed the collection of Wmcr and Scxxc~ Impact t"ces until
issuance of a Building Pen]nit. Please provide a copy of lJle ~ ll~iHCCl's cMlmatc et C{HII~L~CI to our
paid prior to the sclncdulcd pre-consn uction n~ecting
Thc additional fees for watCl' Zllld S~.'\VCI' tltIDS. V,:[lteI' meters, and utilit> inspcctit,n Ices need to bc paid
,10 S Coppcl/ Road Nlctc~s xxill bc t*~dc~cd
separate check at the new Public Works Serxicc ('enter, N
wlnen those fees are paid.
Appropriate pa)a~cnt of the required fees x~ ill help inSLU'C a successful bc?nnin:.z of this pro] cci \\e look
Sincerely,
Chaxlcnc La MaYtina. E.[.T.
Graduate Engineer
CC:
.lenniii~r Annstrong, Finance Director
Mary Beth SpletzeI, AdministIativc Sccretaiy. Building Inspccti~ms
Glenn Hollox~ell, Assistant Director of Public Works
Greg Jones, (~hief Buihting Official
Brad Reid. Director of Pinks and Recreation
Project:
[)ale:
DEVELOPMENT FEE TABLE
Sandy Lake Croxsing, Lot 2R, Block 1
2/10/2005
TOTAl. AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
API'ROVAL
Water Impact Fee
(100% due at Issuance of Building Pcmfit)
Water Tap hrspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) S 126.67
(100% due at Issuance of Water Meter)
Water Metcr Fee (lrrigation/Fireline) S 1.')54.43
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.0()
(100% due at Issuance of Water Meter)
hzigatiorffFireline Metcr Deposit
( 100% due at Issuance of Water Meter)
Wastewater hnpact Fcc
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $5(}.00
(100% due at Issuance of Building Permit)
t ltility Final Inspection Fee $50.0~>
(100% due at Issuance of' Building Permit}
Park Fee
(100% duc prior to Council Approval)
Roadway Impact Fee $1 (I,278.74 $10.275.74
(I00% due prior to Council Approval)
Street Light Fcc h~fk)rmation not Axailable
(100% due prior to Acceptance of Prqject) Il
Street Sign Fcc lnfbrmation not Ax ai!ablc
( 100% due prior to Acceptance o C Prqjcct ) It
Construction Inspection Fee h~lk)rmation not Ax ;~i table
(100% due prior to Start of Construction)
TOTAL $17,599.S4
I'OTAL AMOUNT DUE PRIOR 'FO FILING FINAl. PLAT $1 O,278.74
DEVELOPMENT FEE WORKSHEET
PROJECT: Sand), Lake Crossing, Lot 2R, Block 1
DATE: 2/10/2005
Water hnpact Fee:
Domestic Meter(s): 1 - 1 1/2 inch = 5
irrigation Meter(s): 1 - 1 1/2 inch - 5
0 - 0
Fireline Meter(s): 1 - 6 inch = 2 5
Total#: 12.5 ESU's @ $280 00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total fl: 3 Connections @ $50.00 ea
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ 512667
(Single family due prior to issuance of building permit)
(All other developments due prior to ~ssuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 irrigation Meter(s) @ $126.67
Total #: 0 Additional Irrigation Meter(s) @ $000
Total #: 1 Fireline Meter(s) @ $1,82776
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total fl: 1 Meter(s) @ $30 00 ea
(100% due prior to ~ssuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total Cf: 2 Meter(s) @ $3000 ea
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5
(Due prior to issuance of building permit)
@ $28000 ea
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Totai #: 1 Lots @ $50.00 ea,
(100% due prior to issuance of buirding permit)
ESU's
ESU's
ESU's
ESU's
$3,500 00
$150 00
$120 67
$126 67
$0.00
$1,827.76
$3000
S6000
$1,400.O0
S50.00
$50 00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
Single-family @ $000 per lot
Multi-family @ $000 per unit
(100% paid prior to Council approval of final plat)
$0 00
$0.00
$10,278 74
Information not Available
Road~¥ay Impact Fee:
(See attached fee calculations)
Street l,ighting Fees:
Assessed for lighting in the City's right-of-way
This fee cannot be assessed until after T.U Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CAI~CI;i~ATIONS
PROJECT:
DATE:
Sandy Lake Crossing, Lot 2R, Block 1
2/10/2005
ROAD~VAY IMPACT FEE:
[.and Usc ** ( 'onnnelcial OthcIs N~t Sj¢ccificd
Building Area (si) 7.198
Development Units ** ~ 20
Vehicle Miles pei Dcvclopmcn! I Jnit ** 4 76
Fee per Vehicle Mile *** $~00
Roadway hnpact }"cc due (Dex elopnlcnt [ mis) x
'Vehicle Milcs per Dcx elopmenl [JlliI) x tFcc per ¥C}]lClC \Iilc) g i0.27S -4
': !Figure 2 - Road,.xil.x hnpact l'ee Studyl
'~:(Fable3 Roadx;Ix IinpaclleeStudy)
*** (Sclncdule 2, Page 3 - Roadx~:~3 Impact Fcc Smdyl
I , A,VIOI,)VTDUE: $I0,27874 I