Loading...
Four Seasons 2R-LR050125REPORT OF REINFORCING STEEL OBSERVATION ']rerracon Date of Service: Client No.: Client: 01/25/05 72873 ~-~'~ Hill & Wilkinson LTDj/ 800 Klein Rd Ste 100 Piano, TX 75074 Report No.: Project No.: Project: 94041388.0064 94041388 h ~ndy Lake Road CoppelI,TX Services: Drawings Utilized: Observe placement of reinforcing for compliance with furnished druwings. PROJECT DATA C.51, dated 07/14/04 Locations/Items Observed: Pavement at 0' to 100' N und 0' to 220' W of SE corner of property Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Discrepancies/Comments: Field Results Report To: Technician: P. Labecki Report Distribution: {1) Hill & Wilkinson LTD (1) City of Coppell TX (1) City of Coppell TX 309sks Any discrepancies found were COiTected at the time el' this ob~q(,,ution unless otherwise noted. (1) TMBP Consulting Engineers (1) BCE Specialists This repori is 8×clusively for the use of tn8 clis[I[ ir)dicated above and shall riot be reproduced wit hoLIt written approval ol H BC/Terracol~