Coppell Trade-CS050222COFFELL
FeNuary22, 2005
Al Sorrels
('oppell Trade Center, L/P
5055 Kctlcr Springs Road, #300
Addison, TX 75001
RE: Coppell Trade Center
Dear Mr. Sorrels:
It has been brought to our attention that work activity has begun on tile above referenced
development. We would like to make you ex, are et thc adopted ordinances related It) approved
development activity in tiao ('ity of CoppelI 5;omc el tile requirements under the Code of
Ordinances ol the City el Coppell are based ell federal and state hms.
I TCEQ -
tile conlractor will he required to develop and intplcment a site specific Storm
Water PoUution Prevention Plan (SWP3) in accordance with thc conditions of thc Texas
Pollution Discharge Elimination System (;cneral Constructiol~ Permit (TXR 150000) prior
to construction, and submit a Notice of Intent to thc MS4 (Cky of CoppelI).
Erosion and Sedimentation Control Code Ordinance No, 91514 was designed to
minimize erosinn and sedimentation from private property onto public rights-of-way,
making it unlawtkd to permit a public erosion nmsancc and providing fl~r a penalty of fine
not to exceed the sum el S500 per day dm ins which a x iolation occurs
The Tree Removal PernHt under which you are ~torking allows for the removal of the trees on
she. Howexei', in thc tree removal process, thc cntn'e 40 acre site has been dislurbed This
constitmes mass grading under your Early Grading Pcmnt which requires that erosion COlltrol,
in accordance with the apprmed grading plans and in accordance with the NOI submitted to
I'CEQ, be installed prior to beginning x~otk ('ur~cnllx no t*rosKm control measures are m
place.
1-he Cit.~ inspector, as listed on the approved Earl3 (trading Perntit iIitlst be notified 24 hours
prior to 1oeginning work ~clated 1o Illin pcrnnJl Please COlllacl i~arl'3 [)axis, 972 304-3684, to
schedule a prc-constn~cuon contcrcncc. Erosion cont~ el dcxices nla) Dc inspected at that time
We respectfully request that you immediately contact VOUl contractor, Metro Plex Excawtting,
Inc. and make them aware of the state and local requirclncnts that must be adlrered to prior to
work activity of this nature. Please contact this office st) that we can discuss compliance to all
applicable laws and ramifications of failure to adhere to those laws.
Sincerely,
(("~ene La M~a, E.I.T.
Graduate Engineer
Cc:
Ken Griffin, P.E., Director of Engineering & Public Works
Keith Marvin, P.E., Civil Engineer
Larry Davis, Construction Inspector
Shane Isbell, TCEQ
J-Il 1%3/~ "~3£1Ud 31]l_-lL i qI HESI I iHI':_ IIIUIE;I (] 3l,tl"' g "=- 31'l I J_ 31_Hq
NL-I I _L~I..,I~I I --tN03 39._HSF;'=IH