Loading...
SS9901-CS040421Request For Information (RFI) Coppell Deforest Road Lift Station Improvements Force Main Lines A & B Mr. Tedd B. Sugg, P.E. Turner Collie & Braden Inc. 17300 Dallas Parkway, Suite 1010 Dallas, Texas 75248 Fax: (972) 735-300I RFI 04/21/04 Trttnsmlned By David A. Dickerson, P.E., M.B.A. Se~or Estimator / S~etary-Treasurer S.J. Louis Construction of Texas proposes one "no cost" change alternative on the above referenced project: · Conversion of three locations to horizontal directional drilling (HDD). In order to minimize traffic and surface disruption and increase the speed at which the project can be completed, our company requests three deep excavation areas be converted to HDD using HDPE (.per project specifications): 1) STA 7+00 to STA 11+50 (450 LF), 2) STA 21+20 to STA 26+00 (480LF), and 3) STA 32,-00 to STA 35*50 (250 LF). Again, this would be a "no cost" change, as S.J. Louis Construction would have to compensate the driller for some areas which would previously had been installed by open cut methods, and open cut installation at shallow depth is much less expensive than HDD methods. Payment would be made through pay estimate as if ductile iron pipe materials and casing had been installed without any changes. S.J. Louis Consmaction of Texas proposes one "credit to Owner" change alternative: · Downsizing of bored steel casing diameter. In order to reduce spoil material production and potentially use smaller boring equipment, which would reduce traffic and surface disruption and increase the speed at which ~he project can be completed, our company requests 330 L1e of 36" diameter steel casing be downsized to 30" in diameter for the 20" DIP (95 LF of 36" diameter casing for 24 gravay SS P C remains unchanged), and 88 LF of 48' diameter steel casing be downsized to 42" in diameter for the 30" DIP. The30" ammeter steel casing would still allow 4.7" of clear space from edge ofpipe bell to' ' inside wall of casing, while the 42" diameter steel casing would still allow 6.0" of clear space from edge of pipe bell to inside wall of casing. S.J. Louis Construction of Texas assumes all responsibility for ensuring that the pipe can be installed adequately inside the casing, and is completely confident there will be no problems. Credit to Owner: Total savings of 330 LF x $30,00/LF and 88 LF x $40.00/LF equals $13,420.00, to be split in thirds for value engineering with Owner receiving $4,473.33 credit, subcontractor retaining $4,473.33 savings, and S.J. Louis receiving $4,473.33 savings. Authorized Signature SJL ACtion Let V. Whitman, S.I..Louis Construction of Texas Ltd., LLP File 14016 $,J, l. ouis Construction of lcxa$ Ltd, P,O, Box 834 Mansfield, Tocas 76063 (817) 47%0320 Office (817) 477-0552 Jeax TOTAL P.02