Loading...
ST9905-CS050125Page 1 of 1 Suzan Taylor - Corp Permit From: S~an Taylor To: Loretta Mok~ D,Me: 1/25/2005 8:32 AM Subje~: Corp Permit Lorett8: I am attaching the hydraulic data from the Storm Water Management Plan prepared by Halff & Associates. It show the 2-year fully developed flows. Chadene is working on the 2-year existing flows and hopefully she will be finished by this afternoon. Keith did place a phone call to a former co-worker of his who now works with Craig Bond at TranSystems - maybe he will get back with us. Suzan Taylor~ - Corp Permit From: Suzan Taylor To: ccbond~transystems.com Da~e: 1/25/2005 11:04 AM Subject: Corp Permit Craig: Are the revised channel drawings showing the channel ending at Station 34+50 and the 4 - 10' x 5' boxes complete. Loratta has addressed all of Jessica's questions and requests for additional information for the permit application. All we need are the revised channel drawings to include. We want to submit the revised permit by the end of the month so that we can have an answer from the Corp on or before Apdl. Thanks