ST9905-CS050125Page 1 of 1
Suzan Taylor - Corp Permit
From: S~an Taylor
To: Loretta Mok~
D,Me: 1/25/2005 8:32 AM
Subje~: Corp Permit
Lorett8:
I am attaching the hydraulic data from the Storm Water Management Plan prepared by Halff & Associates. It
show the 2-year fully developed flows. Chadene is working on the 2-year existing flows and hopefully she will
be finished by this afternoon. Keith did place a phone call to a former co-worker of his who now works with
Craig Bond at TranSystems - maybe he will get back with us.
Suzan Taylor~ - Corp Permit
From: Suzan Taylor
To: ccbond~transystems.com
Da~e: 1/25/2005 11:04 AM
Subject: Corp Permit
Craig:
Are the revised channel drawings showing the channel ending at Station 34+50 and the 4 - 10' x 5' boxes
complete. Loratta has addressed all of Jessica's questions and requests for additional information for the permit
application. All we need are the revised channel drawings to include. We want to submit the revised permit by
the end of the month so that we can have an answer from the Corp on or before Apdl.
Thanks