Loading...
Belt Line Trade-CS050223DEVELOPMENT REVIEW COMMIT-FEE ENGINEERING COMMENTS ITEM: Beltline Trade Center~ Lot 1~ Block 1~ Site Plan, to allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.072 acres of property located along the north side of Beltline Road, approximately 1,000 feet east of North Lake Drive, at the request of Edward Eckart, Goodwin and Marshall, Inc. STAFF REP.: Gary Sieb PROJECT ID# SPA-05-0007 DRC DA TE: FEBRUARY 23, 2005 and MARCH 3, 2005 CONTACT: Kenneth M. Gri~n, P.E., Dir. o[ En~ineerinf/Publlc Works 972/304-3686 COMMENT STATUS: ,~'PRELIMINARY F4NAg ~ Preliminary Utility Layout: 1. Loop the fire line around the building. 2. Showlocations of FDC. 3. Provide more detail of valves/connections. 4. Why is the 8" fire line connecting to the building 3 times? 5. Why is the 10" fire line going into then out of the pump room? 6. Additional fire hydrants are needed to meet minimum spacing. 7. Overall design of water will be reviewed in greater detail during plan review. There may be another way to provide fire protection, etc. by tapping the 24" water line twice in lieu of installing a parallel 10" water line. 8. You will need permission from DART to work within their easement to install the 6" sanitary sewer. The northern section of the 6" sanitary sewer should be an 8" sanitary sewer so it could be used to provide service to the remaining lot east of the railroad spur. Preliminary Storm Drain Layout: 1. Include drainage areas and preliminary drainage calculations including the retention pond. · Additional requirements may be identified during full engineeringplan review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Beltline Trade Center~ Lot 1~ Block 1~ Minor Plat, to allow the development of an approximate 375,000-square-foot warehouse distribution building on 27.072 acres of property located along the north side of Beltline Road, approximately 1,000 feet east of North Lake Drive, at thc request of Edward Eckart, Goodwin and Marshall, Inc. STAFF REP.: Gao' Sieb PROJECT ID# MP-05-0008 DRC DA TE: FEBRUARY 23, 2005 and MARCH 3, 2005 COMMENT STATUS: I '/'PRELIMINARY I gINArg ]CONTACT: Kenneth M. Gri~n,P.E.,Dir. o[En~ineerin~fPublic }Forks~972/304-3686~ I 1. Coordinate easements to accommodate changes to the proposed water line. 2. Show City of Coppell and City of Dallas city limits. 3. Will need easement for the sanitary sewer when it leaves this site. · Additional requirements may be identified during full engineeringplan review.