Loading...
Belt Line Trade-CS041115 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: From: Date: RE: Planning Department - Marcie Diamond Parks Department - John Elias Building Inspections - Greg Jones Fire Department - Tim Oates Keith Marvin, P.E. November 15, 2004 Proposed development on Belt Line Road The engineering department has received a set of plans for a proposed development on Belt Line Road east of Denton Tap. I have spoken with the engineer and he has indicated that the property owner wants to do some clearing and grading work then sell the property to someone who would develop it. I indicated to the engineer that we don't normally give early grading permits until the project is a little further along in the process. He indicated that he and the owner were aware of the approval process, but that they felt they needed to do this work in order to market the property. As long as they comply with the necessary stormwater pollution prevention requirements, and acknowledge that they will need to go through the site plan and plat approval process and that may change the details of their site layout, the engineering department does not object to them doing this work. Please take a few minutes to look over the attached plans and let me know if you have any comments on the issuance of an early grading permit. If you want to discuss this, feel free to give me a call at extension 7044. Thanks. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN*'